Monday, October 3, 2011

14 bunker restoration, in the beginning

We began cutting off sod and removing sand out of the first bunker on #14 yesterday evening.  Worked till dark cutting off and digging out sod and sand.  Still have some removal of material this morning and will then begin to tackle the large bunker on the right and the rear bunker.

Kye Goalby from Goalby Golf Design will begin his shaping work this morning.  More pictures to come later.

Skip and Tom cutting sod off of the left bunker to allow shaping work to begin.

After sod is cut, Skip uses the tractor to push the material in piles and into our loader which is then loaded into the dump truck and hauled to the dump area.

Skip digging out the sand from the bunker.  Skip steer loads it into the loader which puts it in the dump truck for removal.

No comments:

Post a Comment