Thursday, December 22, 2011

Metrolink Project

After a few more days of digging, the box culvert running between the driving range and metro tracks is near completion.  There is still a great deal of earth work left to cover the box and provide a gentle swale that will eventually be grassed.  They are working near the 22" natural gas main line that runs across the property so the work is somewhat tedious at this time.  

Track hoe stuck in the mud waiting to be pulled out.  The 22" gas main line is in the foreground.

Looking down the line toward the driving range tees.   515' total feet of box culvert is being laid.  

Box is about 15' below grade at this point.

No comments:

Post a Comment