Sorry for a short report but the staff were working up to the time of our monthly board meetings. The right bunker on #16 is almost complete. A little more sod and some additional sand. The left bunker needs the drainage installed, some additional sodding and sand installed. If the rain holds off we should have 16 completed by noon. I will have a more detailed report tomorrow. Kye began work on #9 before noon.
Joe Wachter
Sent from my LG phone
No comments:
Post a Comment