Wednesday, April 16, 2014

15 bridge/spillway work

Today the staff poured the new flume or bottom of the spillway drain pipes at #15.    
The bottom of the galvanized pipes were rusting through and allowing water to potentially undermine the entire structure.  We intend to resurface the bridge a week from Monday since we have an outing this coming Monday.

No comments:

Post a Comment