Showing posts with label Fairway Bermuda eradication. Show all posts
Showing posts with label Fairway Bermuda eradication. Show all posts

Tuesday, July 28, 2020

Radio interview, Venting Greens, and More

I am a proud member of the GCSAA Golf Course Superintendents's Association of America which is our national trade association. The association has a weekly segment on the PGA Network on Wednesdays at 5. With the Olympic Games originally scheduled for next week, I was asked to be on the program to speak about Glen Echo and our place in Olympic history. As we all know, Covid has since delayed the Olympics for a year but it was decided to go ahead with the interview.  Below is some information regarding the weekly broadcast and how it can be located on satellite radio.  There is also a podcast that is made available after the interview that I will put on the blog when it is ready for those of you without satellite radio.

Listen to GCSAA on PGA Tour Radio Network

“Katrek and Maginnes On Tap" Wednesdays on SiriusXM radio

GCSAA has joined forces with the PGA Tour Radio Network to feature superintendent and GCSAA-related topics weekly on SiriusXM radio. Every Wednesday at 6 p.m. (Eastern) on Sirius channel 208 and XM channel 92, the subject matter will be part of the popular show "Katrek and Maginnes On Tap.”
The program is hosted by Emmy-award winning broadcaster Brian Katrek and John Maginnes, a former PGA Tour player, who spent more than 15 years playing professional golf before starting a second career as a golf announcer in 2005. He won several times on the then Nationwide Tour and had a second-place finish on the PGA Tour at the 1996 B.C. Open, where he was paired with a young rookie, Tiger Woods. He got started on television for the USA Network and then the Golf Channel. He joined the PGA Tour Radio Network in 2005 and has been a fixture there ever since.

We have had a pretty warm July with over 20 days of 90 degrees or better. Our average for July is normally 14.  Timely rains have kept the course green from wall to wall so we have that going for us which is nice. Of course a little quote from 'Caddyshack' which had its 40th anniversary the other day!

Its that time of year for where we try to get a Needle-tine venting of our greens. This process is completed for the following benefits:
  • Exchange of gas.  Oxygen into the system and hopefully the removal of some harmful build up of carbon dioxide which can build up in the soil
  • Movement of moisture into and out of greens. Some sections of greens are dryer and or wetter based on their location, irrigation head set up and other factors. The drier sections of greens will accept water more readily with some holes in them and the wetter areas will dry quicker with more air entering through the holes.
  • Root growth is at a minimum but root life is essential. These small narrow channels provide optimum growth potential if the plants are able to respond.

Our process includes mowing the greens, doing a light topdressing since temperatures are to be in the 80's, needletine, than roll to smooth down the holes. We usually roll the next day to reduce the potential for scalping than start mowing again on the 3rd day. We were able to complete the PG, 1-9, 12 and 18. We will complete the remaining greens this morning.

We had hoped to get some bermuda sprayed on fairways but weather and timing did not allow us to do this work. We will begin spraying in the next week as weather and time allows. Hopefully will get a 2nd application completed to where the effects will not be seen for Member/Guest at the end of September.

We will also begin spraying collars to reduce bermuda competition. More blogging on this work as it begins over the next few weeks.

Hopefully we will see you on the course over the next couple of weeks.

Saturday, June 22, 2019

Blues, Stimulation, and Getting Tight


What a whirlwind the last two months have been if you are a sports fan in our fair city. Great run for our St. Louis Blues as Pierre Laclede can attest outside city hall last weekend!!! #LGB

Speaking of stimulation which our Blues did plenty, we have finally been turning to the good side of weather over the last few weeks even though Friday and Saturday have been wash outs for the most part.

Glen Echo is a warm season golf course. Our largest area of fine mowed turf are our fairways and tees which account for almost 30 acres of warm season grass, mostly zoysia. The bermuda grass which I have a love/hate relationship with is required to help round out our course and fill in where we have voids in cool season fescue, poa annua and bent grass which invades our rough. The long cold winter has slowed its emergence in higher traffic areas but warmer temperatures are beginning to help it fill in where we need it.

There were enough gaps in the rain during Stanley Cup winning week so we could apply fertilizer on the fairways/approaches which will improve green up and also begin to help the turf fill in as needed. Most areas where we have needed to replace turf in fairways occurred from some of our bermuda eradication work last fall and some winter kill of both bermuda and a little zoysia. Also we experienced a few thin areas in north to east facing slopes 10 and 12 approach and also from excessive shaded conditions.We still have a few more places to do some sod patching on fairways, intermediate, and a few green approaches and surrounds. As temperatures increase which increases soil temperatures, this will also speed up growth of our warm season grasses. We did modest fertilizer application around the greens to improve fill in of the bermuda and give the cool season turf just a bit of energy to fight through the rest of the summer. We will do some additional spray-able and granular apps along weaker fairways and around all fairways in the first pass of the rough.  This will improve color and thicken the rough for the summer. Oh joy he's going make the rough rougher, yes, yes I am.

I think overall our rough is about in the best shape I can remember since arriving in August of 2008. Still fighting some weeds in various parts but are getting some good kill throughout the property. applications.


We had hoped to begin aerating fairways on Monday but it appears we will be too wet. We will try next Monday on our closed day which allows us to get a full day in. We will also do some individual fairways this upcoming week if we begin to dry down.The fairway aeration program should improve the turf in a number of ways:
  1. Reduce thatch through increased microbial soil activity
  2. Increase water penetration and drying down in wetter areas
  3. Assist with disease management including fairy ring
  4. Stimulate turf growth
  5. Reduce compaction in our fairways soil
  6. Breaking of the cores will help to fill in small imperfections in  surface areas.
Russ mowing 2 fairway.
From behind #2 green

The course continues to tighten and improve as we work our way into the first week of summer. Tree trimming, tree removal, sodding, aeration, and just general clean up of all areas are ongoing 

 I've included a Countdown Timer on the main page of the blog for the upcoming Invitational Member/Guest coming up in July. Amazing to think we are less than 30 days away from this great event.

Monday, September 17, 2018

Bermuda Eradication #5 Fairway

 Video from 5 fairway regarding our herbicide application on holes 4-5, 7-8, 10-13, 15, 17-18. Holes 1-3 were sprayed a few weeks ago at what amounted to a lower rate. Came back with an updated rate on the holes above which will show more damage to the bermuda.

2nd application went down the other day on our collars and we also hit some of the approaches missed by the first spray. Also did some backpacking where the zoysia came up next to the greens, mostly on approaches since the zoysia cannot handle the over spray of this material.

https://www.youtube.com/watch?v=_cat-JTKk90


Thursday, August 30, 2018

Spraying Collars with Bermuda Contamination As Well As Some Fairways

Last week, Tom sprayed the collars that had bermuda contamination in various stages. We still must backpack spray areas that have zoysia next to them because the chemical is harmful to zoysia so we will do it very carefully with our small sprayer where bermuda has contaminated the collars next to zoysia.

This week the bermuda has turned white if you have been out to the course the past few days. The chemical used (Pylex) disturbs the cartenoid biosynthesis. Carotenoids serve two key roles in plants. They absorb light energy for use in photosynthesis, and they protect chlorophyll from photo damage. By turning white, the chemical is disrupting chlorophyll production in the plant. We are applying this product at 1/2 ounce per acre because it is being applied over the top of bentgrass. It can damage the bent so we are going with lower rates to offset injury to the bent. Standard use rates on more tolerant species are only 1 to 1.5 ounces per acre so as you can see a highly effective product at low dose rates. We must do 3 consecutive applications over about 1 1/2 months to kill the bermuda. Of course, you must then go after the bermuda that is outside the collar so it is an on going process.

Collar on 10 turning colors from green to white. Part of the plant is still green. Successive sprays should for the most part kill it.

This is a section a few feet away in the approach that was not sprayed.
I also sprayed 3 fairways with our fairway eradication product last week. You are beginning to see some changes in fairways 1-3 and a little on 18. The bermuda in these areas will turn a little reddish as the chemical works its way into the plant. I'll have pictures of this over the next few days as the chemical begins to do some damage to the bermuda. I need to spray other fairways but rain and high heat have gotten in the way. I'll probably spray them right before Echofest so it does not disrupt the color until after the event is over. We also must get these sprays completed before the zoyia grass goes dormant which could effect its ability coming out of dormancy next spring.

Tuesday, July 4, 2017

Bermuda Eradication Part Deux Hundred

First early morning arrival to the course in a while. Don't miss getting up at 4:30 but do miss the course waking up. Shot a little Bermuda Eradication video and yes we will be killing some Bermuda after the Invitational. I have not sprayed this year due to some weakness in the Zoysia.
 Fairways overall continue to improve with some filling in needed on 1,2 and 4. Tees were aerated last week, fairways were spiked which is the reason for the little slices with the brown edges where they dried out. Most of those areas have recovered. Yes and I have the finger ready for the video!


Monday, April 3, 2017

Fairway Bermuda Eradication Version 2017

The Zoysia fairways are greening up early this season. Our fairways at Glen Echo have a tendency to be a bit behind because of our Bermuda Eradication work we are doing with late Summer early Fall herbicide applications. I think most will agree we will take being a little bit behind in trade for the great shape they have been in mid-summer until the end of the season the last few years. First video of the year about our Eradication program describing the area  on the north side of the main road of #8.



Saturday, September 24, 2016

Sunday, July 31, 2016

Fairway Bermuda Eradication #10

Video below discusses our ongoing Bermuda eradication work within our fairway and intermediate. I could not be more pleased with the results we are having but we must continue to reduce the Bermudas ability to spread by pounding it with our chemical treatments before fall sets in and it goes dormant. Hopefully mother nature will give us some help this winter and freeze more of it out!

https://youtu.be/5Vu7iDmB3bM



Thursday, July 7, 2016

Bermuda Eradication Update Hole 5

Video updating Bermuda eradication work.  We did lose a few pieces of sod from our earlier replacement and will be removing in next couple of days. Other than that, work is going as good as can be expected. Next spray will be after  MAGA Amateur in early August. Can't stop, won't stop till its gone!

https://youtu.be/y97upt315AE

Friday, June 3, 2016

Well, There He Goes Again, Fairway Bermuda Eradication Time Again!

I know, does'nt have a darn thing to do with Bermuda grass. Lady at Invitational 2013 or 2014
Yes, I am going again President Reagan! Time for the 2nd app to the fairways of our Bermuda eradication program. Sprayed 10 acres today through Hole 10. I will spray the remaining fairways on Monday. I did not apply in some weaker areas and intermediates where the Bermuda is too heavy. As you've seen in other posts and other forms of social media, the staff have been laying a great deal of sod in many places to improve our zoysia coverage. We have  a little more to do but for the most part that will end but we will continue to add some sod where we have some especially thin turf areas from our nursery over the next few weeks.

Some might question why spray again? Our fairways are a little weaker than other places in the district.  We have spent a great deal of time, sweat and money in sodding and treating our fairways with chemicals to reduce this weed's competitive edge. It's important to continue the program or the gains we've made will have been wasted.

I would expect the turf to begin to show its effects from the chemical early in the week and the Bermuda will begin to be effected more severely within the next 10-14 days. In about 2 weeks, the Zoysia should begin to change from a lighter green to its normal
green color. We will also be fertilizing our fairways early next week which will encourage the Bermuda to take in the chemical and help the Zoysia return to normal.

We will discontinue spraying because of our busy July schedule and will commence again after the first week of August and the Metropolitan Amateur Championship.



10th Fairway with indicator foam to mark the passes to insure overlap does not occur.

Tuesday, May 24, 2016

Holes 8 & 17 Fairway Intermediate Sod Work/Bermuda Eradication Program

As the staff was cleaning up the course yesterday from weekend play and prepping for a tournament, eight more pallets of zoysia grass rolled in waiting to be laid today. Praying for no rain as I mowed fairways this morning at 230 a.m(no that's not normal)  clouds hung around but the rain stayed away. Had the crew split between three main jobs, course prep for The Lorette Medart Tourney, tree work on 3 and sod work on 8 approach and then the start of 17. The guys busted their butts today. Placed about 325 yards between 8 and 17. Still have another 75 yards for 8 on Wed. Of course not forgetting about two other hard working people. Becky is in the middle of planting her near mature babies she's nurtured since mid-March. Of course she having to dodge some smart and excited hummingbirds who flirt in and out looking for some great nectar. Dave is hard at work keeping our aged fleet up and running.

The sod removal process involved:

  • Cutting out the old stuff with a sod cutter and hauling it to the dump
  • Hand raking smooth
  • Applying some fert to get the sod started rooting
  • Laying the sod
  • A little drink of water, finished. 
Hard work plus the added pressure from the boss to leave the area before our ladies groups passed through. These areas were sprayed with our Bermuda Eradication spray. In some cases, just a few hairs of Bermuda trying to creep back in. We will continue to spray these after the Zoysia roots to continue to knock it back.

If you missed the earlier video from youtube regarding our plans on #8, its at the bottom of this group of pictures.

Alphonso and Latrell cutting the new sod in place.

Randy and Jeremiah lifting the old stuff in the top near the bunker. Old sodcutter  resting and waiting for its next task.

I captured this from the blog/video I posted regarding our plans a couple weeks ago.

Finished area looking good. 

Russ, Latrell and Jeremiah. Also had Tom, Jason, Parker and Skip who rammed this work through for me.

Looking good start of #17


https://youtu.be/D8eMX2mJT3I





Friday, May 6, 2016

Bermuda Eradication Program, #8 and Other Areas

As you know, we've been installing Zoysia the last couple of weeks as a part of our Bermuda Eradication Program. This week we were able to finish on 10, did the start of the fairway on 15, the intermediate near 16 approach and at the bottom of the approach on 18 green.(still a couple pieces to lay at press time). There has been mention regarding from the main road to 8 green and I did a video discussing what we are doing on this hole. We will be replacing some of the sod on this hole and will be allowing the Bermuda do grow back to fill it back in. We've given the Zoysia a good start in some of these spots and might go back in and reapply product where the Zoysia is strongest.

I will be applying one more application to the fairways before summer arrives helping to knock the Bermuda back that is mixed in with the Zoysia, that will occur in the next couple of weeks. After that, I will be allowing the fairways to grow no matter what the grass so they will be in good shape for the rest of the summer season. I will then go back in again in late summer and hit the fairways again to set up the Bermuda for winter kill.

Not how we normally roll out sod but the guys decided to just roll it out and then were going to make some adjustments. Early season Zoysia in big rolls is not usually the easiest to work.

https://youtu.be/Z2mKYopfr1A



https://youtu.be/D8eMX2mJT3I



18 Approach at bottom of the hill in the intermediate

16 intermediate on both sides near the green

Finished up the right side of 10

Wednesday, April 27, 2016

Bermuda Eradication Program #10 Intermediate Sod Replacement

The past couple of days, the staff have worked on replacing the intermediate along #10 Fairway. We are replacing a little more than 1/2 of it due to Bermuda contamination. We have some spots along the right side that we cut the old sod off but did not have time to remove the old sod and place the new sod. We should have this area completed by next week since conditions are wet and we have an outing for more than 1/2 the day on Friday.

We will circle these areas as ground under repair. We will also circle the new areas and ask that you take a drop from these areas. We have a number of other areas on fairways and intermediate on a number of other holes on the course over the next few weeks as conditions and work schedules allow. #10 will take about 800 yards of sod. A box blade on a tractor and the loader would be more efficient and would help quicken the pace of work but would also create excessive damage because of the weight.

We sprayed these areas with not only our Bermuda Eradication spray but also Round Up last fall in an effort to knock the Bermuda down a bit more. A cold winter would have helped us even more but to no avail.

Most of the area can be driven across with carts without any issue. We used mostly big roll sod which can stand up to more wear and tear. We have a little softer conditions at the circle around the start of the fairway. We will rope off this area and place cut thru areas for walkers. Please follow any signs or ropes to assist us with growing the turf.

Jason using the sod cutter and cutting out the old material. Our intermediates are cut with an 84" mower. The tractor in the background was used to roll out the sod.Sorry no pictures of that operation. Just got too busy and failed to get enough pics.

Randy, Latrell and Alphonso physically removing the cut sod.

The arrows point to the intermdediate that was replaced. We still have to replacement to do up the right side.

The green line shows that we started where the cart path ends on the right side of the fairway after it comes across the lake spillway and went all the way around to the bridge less than 100 yards from 10 green.

Saturday, April 16, 2016

Fairways Sprayed(Bermuda Eradication Program)

I made the first spray of the spring season to our fairways as a part of our Bermuda Eradication Program. I would expect at least one more spray in the next 30 days or so and than a little break in the program allowing the sodded areas and some pretty significant golf events to get completed and we will then spray probably 2-3 more apps in late summer/early fall.

I would expect the Zoysia to turn slightly off color for about 10-14 days. My hope is that we've timed it properly to knock down some Bermuda significantly but to also reduce the amount of seed heads we will have from our Zoysia. If we are able to reduce the seed heads this will allow the zoysia to save energy that it would have used in producing seed. Lets keep our fingers crossed. I posted a video below regarding this program. Miss you girl.

https://youtu.be/ml3O_4MHnP0

Saturday, April 2, 2016

2015 to 2016 Fairway Bermuda Eradication #12

Another example of our Fairway Bermuda Eradication work on #12. View below is from Spring 2015 where we had sprayed the Bermuda the fall before with our product. The last photo shows how well the Zoysia has filled in and how the Bermuda has been slowed allowing these improvements. We will still need to spray these areas further to help suppress the Bermuda even more but the program is working well in many areas on the golf course.

This was last spring looking up the hill toward 12 green. Fall 2014 spray hit the Bermuda pretty hard in this area.


Some replacement last season in the larger areas.
Very little Bermuda coming out right now. A great deal of the right side intermediate is Bermuda that is slowly coming out but very little if any in the main part of the fairway. This chemical applications are working very well for us. We will have to continue to do some wholesale replacements in the intermediate rough because some areas are completely void of  Zoysia.

Saturday, March 26, 2016

Fairway Bermuda Eradication Progress

Edited 3/26

I was doing some research on the blog site the other day and ran across the April 2014 video showing some damage or weak areas in 1 Fairway where Bermuda was sprayed the fall before.

I did the same thing last fall on this same Fairway but you see hardly any Bermuda damaged from last falls spray because the Zoysia has improved significantly in these areas. That does not mean the Bermuda is completely gone, it probably isn't but it does mean that the  Zoysia is more active and out competing the Bermuda in this area. The first video is the current view and the second video is from 2014. I thought you would enjoy seeing the progress, I sure do!

Shortened Version
http://geccgcm.blogspot.com/2016/03/shortened-and-updated-video-of-bermuda.html

Longer Videos from original post.

MARCH 2016 VIDEO

https://youtu.be/4kowErpDMEI



APRIL 2014 VIDEO

https://youtu.be/BwOvmej_tBU

Tuesday, September 22, 2015

3rd and Final Fairway Spray on Bermuda Completed Today

Today I finished spraying the fairways of our Bermuda Eradication spray. I also sprayed 4 acres of rough on the front 9 as well this afternoon. I need to spray greens surrounds and the back 9 in the next few days. More reports will come your way as the work is completed.

https://youtu.be/rQPRmeOCtlQ

Friday, August 21, 2015

Sod and Bermuda Eradication Work This Week

The staff laid a couple pallets of zoysia this week, a pallet of fescue and sprayed fairways/tees in our Bermuda eradication work. We will try to cut out a couple pallets a week of Zoysia as play and work considerations allows until dormancy in early October. There are a few areas that have large patches of Bermuda that should be replaced. Zoysia will only move about a foot or two a year.  Once the Zoysia covers these areas, we will make additional sprays over top of the Zoysia to discourage the removed areas from filling back in with Bermuda.

I was intending to spray some greens surrounds and bunkers with a new Bermuda Eradication product called Pylex herbicide  but was not able to get that accomplished. Maybe Saturday or early next week. More details on this product next week after I make the applications.
Randy, Rico, Latrell and Tom cutting out the bird bath area about 225 yards on the left from 7 green. Had to remove some extra soil at the end which was helping to hold the water in place.

Finished product. Please drive around and play as Ground Under Repair until we remove the stakes.

Area on the left of #8 fairway which receive much less than ideal sunlight during the day to support Zoysia. Hopefully some selective tree trimming, traffic control measured and compaction reduction will improve this area.

#15 where some large patches of Bermuda have been living. Trying to spray these areas out and replacing with Zoysia.

This is a picture of 18 fairway about 150 yards from the green. You can see the heavier dew formation on the Bermuda grass. Larger patch in the background which could  need to be replaced with sod once the eradication spray takes effect. The foreground area should burn down below the surface of the Zoysia grass and will need to be applied again toward mid-September. Late applications reduces the Bermuda's ability to store energy for winter making it vulnerable to winter kill.  An application or two in spring and early summer followed by 2-3 applications in fall should help us put this weed on its heals. We might never get rid of it but we can put it under serious control in our main playing areas like our fairways. 

Wednesday, July 22, 2015

Glamour/Beauty Shots, T-Minus About 4-5 Days and Counting

The other day if you listened to my aeration video, I made mention of doing some Bermuda eradication work in the next few days in the fairways. Today was the day so you have about T-minus 4-5 days before the fairways begin to turn off color. The course will still be in great shape to play but our fairway surfaces will be a different color.

I did mention that I probably would not do 11-12 acres like I did last fall. Well, this morning as I was spraying my first 4 acre tank and it got me up to one pass through #4, I said lets jump into it with both feet. The more widespread I make these treatments, the less time it will take and then all we have to do is maintenance treatments every year.

I sprayed 18 acres of fairways at about a mid-rate of Fusilade II 4 oz/acre and 32 oz of Turflon per acre. Rates might be overall slightly less since I think my rate was spraying at slightly more acreage than the chemical I mixed but that is okay.

Within the next 4 days or so, you will begin to see a little tinge or off color look to the fairways. The zoysia will be slightly yellow and the Bermuda leaves will begin to turn a little purplish red. The next couple of weeks they will remain off color until the chemical after about 3 weeks has done its dirty work. The Bermuda will not die in most cases but will be suppressed. As the Zoysia comes out of its slight off color state, it will begin to show up a little stronger in many areas where the Bermuda is still weakened. Now, it won't jump out of the ground but it will begin to poke through in areas. This is multiple years work to try to gain control of our fairways back to Zoysia. You will be able to see significant reduction in Bermuda especially on the flat area of #3 and #13. Holes 4 and the flat area on 7 have also been in the rotation the longest. I think the 2nd fairway will also start showing improvement because most of the Bermuda is entwined in the Zoysia.

The intermediates were not touched since we mowed them this morning and I could not see the dew pattern on the Bermuda. I might have to wait a few days to spray it since rain is predicted and higher temperatures. I spray on a heavy dew morning because the Bermuda usually stands out because it has more leaves and has a darker green tint to it. As I was applying the material on the fairways, I was seeing a lot of areas of strong Zoysia with the Bermuda intermingled. These are perfect areas to try to gain some traction. I did attempt to skip the Bermuda in drainage areas. In the next few days as the color begins to change, I will take some video and pics to explain what is happening. I will do at least 2 more applications before late fall to help push the zoysia along further and suppress the Bermuda.

I can understand your concern, its looking beautiful, why tear it up now? If we become a Bermuda fairway golf course again, we could have large sections of winter kill and fairways that are not nearly as good to play off of at any time during the year. As Andy Dufresne said in Shawshank Redemption, 'Time to start living, or get busy dying'. I am choosing life for our Zoysia and death or a weakened state for the Bermuda grass.

If you are interested in our past work on Bermuda eradication, click on the link below which will take you to say posts from the past.

Fairway Bermuda Eradication

Thursday, June 4, 2015

Video Regarding Tee Aeration, Juvenile Red-tailed Hawks and Other Information

Rain put a damper on our tee aeration plans today. We will probably finish the work next week. Video discusses that work as well as the fairway turf situation, greens bunker edging and a couple of other areas. Photos below also add to discussion later of these subjects later in the video.

Our Red-Tailed Hawks picked up stakes and moved to the Sycamore near 5 White/Blue tee this year. I had kind of lost track of them this season until Ms. Herrin mentioned where they were located. If my eyes don't deceive me I think we have 2 juveniles about ready to take off on their 1st flights soon!

https://youtu.be/0kS6uzl8yzU



Bunker edging. Sand was deep enough along edge I had to use a spade shovel to reform the edge. Back 9 are complete as is  Holes 8-9. Hope to finish the rest of the front next week.

From time to time you will notice some black algae appearing on greens. This usually occurs because of climatic conditions, warm and humid conditions and sometimes and the end or past time for a fungicide application. The past 6 weeks have seen a weekly application of some type of required spraying product either it be a growth regulator, summer root disease management product and wetting agents to keep profile consistent in its moisture content.

This is from the 2nd green and the ugly reddish colored turf is poa annua which does not like Paclobutrazol, a growth regulator product we have been spraying every 30 days or so to help reduce the impacts of poa on our greens. My last application last week was 1/2 the rate of the month before.  As we get into summer, we cannot over stress the poa annua or it becomes poa deadua.  Too much poa annua dying quickly could contribute to yours truly's untimely demise. This type of condition does help bentgrass grow into the area and improve our total amount of bentgrass coverage. Losing 20-50 poa annua is something I do not want to see in my lifetime unless I was spraying Round Up and trying to kill it.