Showing posts with label Fairway aeration. Show all posts
Showing posts with label Fairway aeration. Show all posts

Monday, June 5, 2023

Fairway Aeration

Staff spent the day beating on the fairways with a number of tools. Allow me a few moments to explain:

First we used our core pulling aerator to pull 1/2” plugs from fairways 1-5, 7-8, 10-13, and 15. Normally we would get a plug averaging 2-3”. With the drier soil, we were barely able to pull a little over an inch.


https://www.youtube.com/watch?v=W8syQtsNWGA

Second, we used our leaf vacuum which has vertical   blades that cut down into the soil and create a vertical mowing pattern into our zoysia fairways assisting in removing thatch. This process also broke up the plugs, removed some of the excess blades and soil. 

   

https://www.youtube.com/watch?v=JD6nbTLaulU


Thatch brought up by the vertical mowing blades.


Couple of loads of soil, thatch and grass blades from thé vertical mowing. 

 

Third we used a couple of drag mats to break up the remaining cores and disperse the excess material accumulated.

Dragging fairways with metal drag mats

We then took our blower and blew the excess material into the rough. 

We aerated, vertical mowed fwys 1-8. We had to stop on 8 with an equipment breakdown. We continued aerating and dragging through hole 15. We have mowed fwys 1-7 and will mow the remaining fairways when they dry in the morning. Not sure when our vertical mowing will continue with the breakdown but will pick up where we left off.

We also applied some organic fertilizer to the fairways through #8 and then watered it in. Science has shown with the use of organic fertilizer and removing excess thatch through verticutting reduces the amount of fairy ring and large patch in zoysia fairways. We also plan to use our slicing blades with our pull behind aerator over the next month or two to improve water and gas penetration.





Monday, July 18, 2022

Overlay, Holey Moly, Petri Dish, Renovation and Bye Bye Bye

It's been quite a while since I've blogged. three months, a couple Marathons and about 15 pounds less and pff its July. 

Mother Nature was not overly kind to us in the month of June but we survived. High temperatures and a big water bill toward the last 1/2 of June and into July will make for an interesting Financial Statement for the Grounds Department for July. 

We also had a little damage to a couple greens at the beginning of last week but things seem to be turning around and a majority of the spots are healing. We have others greens at various stages of funk and lacking beauty but generally speaking we are in pretty decent shape as we begin another hot stretch of weather over the next 7 to 10 days. 

We've been doing a great deal of hand watering in the mornings and afternoons and at time it appears we are taking a step forward and 2 steps backwards. Many times you think you see some disease, you pull the sample and you send it to your turf pathologist to tell you what you've contracted and what you need to spray. On many occasions there is not a great deal of disease in the sample but Abiotic Stresses are usually the #1 contributing factor in the sample. So Joe, what are abiotic stresses? Common examples of abiotic stresses are created by severe and or adverse changes in one or more of the following conditions: 

  • Temperature
  • Humidity
  • Rain
  • Wind
  • Latitude
  • Soil Composition
  • Radiation(Sun)

So basically summer in the heartland of Missouri.

Your mind begins to wander as a grass grower during some of these stretches of severe conditions. "Am I seeing real issues or are we just seeing the effects of summer on living and breathing grass"? 

Your first thoughts are "I have to do something but experience has told me if you've done everything possible, the best thing to do is do nothing and allow the abiotic conditions to change to a improving plant health environment." 

Now don't get me wrong, you can't just give up just yet and say its abiotic stress and there is nothing we can do. One has to control water, continue to spray for plant health and be diligent in monitoring but patience is very important. 

CART PATH OVERLAY

Well, its that time again for some overlay on the golf course cart paths. Section 2 with the third coming next season. We will be laying roughly 12,800 feet of asphalt to over the next 5-7 days. Holes included in this run will be the completion of 4 from the Field Bar to the main road and 5-9. Also included will be holes 10 through 15 tee at the lake spillway.

  • Our plans are to begin on Tuesday, July 19th on holes 5-6, 7 tee to main road and 8 approach fairway back around to #9 green and the main road.
  • We will then pull out from the right cart path along 10 lake back to the main road. From the bridge on 10 approach back to the main road, 8 bridge tee back to main road. 
  • 15 tee from the lake bridge back through 13 tee/12 green. 
  • 12 green to the Field Bar, From Bridges at Field bar back to Cart path behind 7. Connect 4 and 7 back to the main road and we are complete.

I will make daily updates on Social Media and this blog.

Myself and staff members will be in the area helping to direct trucks and members/guests as we are working through the project.

Of course after the asphalt has ben completed, our staff will then begin the process of making smooth transitions between the new height of the path and the old grade along the side of the paths. This work will be ongoing through the rest of the summer and into the fall and winter as time allows. Of course cooler temperatures of fall and winter are more conducive to new turf survival but we will do what we can on the most severe drop offs to reduce the potential of accidents and or damage to carts or members in their carts. 

Just a reminder when operating the carts in the new asphalt areas, drive your cart at an angle so the cart wheels enter and exist with all tires hitting separately. This can reduce wear and tear on the new carts and protect our members and guests from injury. It would be wise to reduce your speed at entering and exiting the paths until we have opportunities to get these areas leveled. We will uses stakes and roping and or caution tape to alert you of any excessive differences in the height of the pavement and the exiting grade along the paths. 

 Asphalt Work July 2022 - YouTube

Contractor was out today grinding the areas that will have new overlay so they will butt up against them properly. This allows for a smooth transition between the new and existing asphalt.

HOLEY MOLY

We started fairway aeration a couple of weeks ago and has since been sidelined due to the aerator lift cylinder needing replacement. It has since been repaired so we will try to finish the remaining holes on the front 9, 1-3 and #7 over the next week or so as weather and work responsibilities allow for its completion. 

Below is a video of our aerator a couple of weeks ago. Many holes in those fairways and soil plugs pulled out onto the surface of the fairways. The rain on the weekend of July 9-10 helped clear up the soil on the back 9 and the Sunday  rain assisted to dissolve the existing soil back through the turf of the completed holes on the front 9. 

 Fairway Aerating - YouTube




PETRI DISH

This morning was a Turf grass Pathologists dream morning. High humidity, a layer of fog and warm. As I drove out the paths at Glen Echo this morning there were large patches of disease areas becoming active on the ends of the grass and down at the soil level of the turf. There were many plants with white mycelium which is where fungal disease is usually active. Its usually at the tips of blades due to guttation water coming out of the plants pores which is laden with nutrients that the fungus feed upon  Our superintendent text chain was lit up with photos of various levels of activity early this morning. 

One of the activities that assists in reducing this disease is the actual mowing of the grass and or rolling. These practices help to reduce the wetting time of the leaf which assists in reducing or stopping the additional formation of mycelium. Of course fungicides reduce this impact as well but we cannot afford or have the time to spray all of the rough to reduce this disease activity. We attempt to keep our greens, collars, smaller green and tee surround areas from infection which can look rather unsightly or weaken the plants.

Dollar spot on cool season grass. Phot credit LSU Ag.

TEE RENOVATION

The tee renovations of the blue and red tee on hole 9 and the special event tee for 17 made near the patio I believe turned out looking really good and were ready for play within about 18-20 days after completion. It appears they are holding up well and provide great playing surfaces for the future. We plan on expanding the drop zone tee at 9. Enlarging it slightly and leveling it in the next week or two. Our first effort was a bit rushed and was not the quality of work that we attempt to create when we renovated it last season.

9 Red tee

9 Blue tee


Bye, Bye, Bye


Music and video by NSYNC.

Well, we aren't talking about NSYNC but we are talking bye, bye, bye to the continuous mulching of the walk paths to the practice areas with new brushed concrete coming soon. Moles, washouts from rain were just some of the problems experienced on these paths over the years.

We intended to complete part of the paths this week but the asphalt contractor was available to come a week earlier so that project will get priority and we are on hold. We also have high heat coming in again this week so we have to make sure we have enough staff available to keep an eye on our greens, maintain the course and assist with the asphalt project We hope to start this work next week.
The paths will be 5’ wide and brushed to assist in reducing slipping.
Top photo is short path at long range. Bottom left is long path at long range and bottom right photo is short range. 

Thanks for your time. Come out and see us when you get a chance!




Monday, August 2, 2021

Cart Paths and Fairways

Over the next few days, there are a couple of large scale projects taking place on the grounds of Glen Echo CC.

Sunday evening we began to aerate our fairways. Skip and I came in once the last tee times went off and started pulling cores and then busting up the cores with a Flail mower that has spinning blades and chains and pulverizes the plugs. Today we will begin to drag the fairways with metal drags which breaks up any plugs that made it past the grinding. It will also help work the soil back through the zoysia canopy. We blow the remaining thatch and residue into the rough where it can be chewed up by the rough mower. Earth to earth and dust to dust. The fairways are then mowed. We anticipate this taking more than one day to complete all of our fairways. We normally have 3-4 fairways to complete usually on Tuesday and or Wednesday depending upon the weather conditions and anticipated play. 

Asphalt work will begin in earnest on Tuesday with the front clubhouse circle getting an overlay, Grinding along the edges of the crosswalks in the Pearson Plaza and near the portico will be completed and then a layer of asphalt will be laid in the circle area.We will begin asphalt on the course on Wednesday. The first work will be from the bottom of 3 hill all the way into the first tee and also the path that goes to the range.

Large dump trucks will be taken by our staff out into the field to assist in navigating through play. We will stage them in the parking lot and they will be brought out from there. They will also be brought back in once empty. Once the first section is complete, they will proceed to the second section which will be from the lowest point on hole 3 going forward through 4 tee to where it ties into the path behind 7 green. Those trucks will be staged  in the main entrance area, The new overlay will be 2" thick and we have a total linear footage of about 5,700' at an average width of about 8'.  

We anticipate this work to be completed by Friday. The asphalt will be able to be driven upon the next day. Depending upon weather, we will begin the process of back filling dirt in along the path and sodding fescue to help make a smooth transition with the new grade. We will do sections at a time to give us the best chance at growing the turf in properly since we are still into summer heat. I would not anticipate all the sodding to be completed before winter is upon us in December. Some areas might not need any back fill which will be helpful.

 

 

The sealing and striping of the parking lot is scheduled for Monday August 9th. Once the delays in the parking lot moved closer to our open window for the cart path overlay, the two projects were switched around so the sealing would not be damaged by the large asphalt trucks. This work should take 2-3 days next week.


We appreciate  your understanding during this time.Check you emails for updates and or social media for both the club and my personal accounts.

Instagram joewachter

Twitter jdwachter  Joe Wachter

Facebook  joewachter4


 




Monday, July 1, 2019

Fairway Aerating

Mother Nature has been in charge all season with wet conditions. With only a couple of dry days every so often combined with a heavy play schedule, we were finally able to get dry enough conditions to aerate our fairways today. A few pictures with a couple drone videos.
Our process included the following steps:

  • Mowed Fairways to help reduce dew and the total amount of turf that would need to be mowed off after the process is completed
  • Aerated the fairways pulling a solid core with a 1/2" tine about 3" deep
  • Used our flail mower to help break up the cores after they dried for a few minutes. This mower has tags slightly larger than a dog tag that is attached to a rapidly spinning roller and literally flails apart the soil, thatch and grass plugs
  • Used 2 metal drag mats to break up the remaining pieces of soil that built up
  • Used our tractor blower and pull behind blower to remove grass turfts and excess soil
  • Mowed the fairways again to clip off the turf pulled up and help break the soil that was still left on the fairway
  • Sprayed the fairways with a soil penetrant and urea fertilizer to assist with the healing process and improve overall turf vigor
Aeration improve turf root structure, water penetration and drying of wetter areas, thatch reduction, gas exchange, and microbial activity which will improve over turf quality.
Jason pulling cores on 18, our last hole. Dodged a big bullet with the thunderstorm that hit around the I-64 area. Brought us in for about 45 minutes because of lightning.
 
Little drone view of Jason's work.
Tom using the flail mower with the before and after going over the area. Does a decent job.
 
Skip and Rollo dragging fairways to break up remaining cores and soil in preparation for the blowers to remove the remaining material into the rough.
 
Russ in a dust storm and he mows over the distrurbed turf on #1.
Sprayed fairways 1-5 and 7 with Urea and watered it in to improve turf vigor and color.
Will complete the other fairways as time allows over the next day or so. We included a soil penetrant in with the spray to assist water penetration over the next month as we begin to move into drier weather and the need for irrigation cycles.
 

Saturday, June 22, 2019

Blues, Stimulation, and Getting Tight


What a whirlwind the last two months have been if you are a sports fan in our fair city. Great run for our St. Louis Blues as Pierre Laclede can attest outside city hall last weekend!!! #LGB

Speaking of stimulation which our Blues did plenty, we have finally been turning to the good side of weather over the last few weeks even though Friday and Saturday have been wash outs for the most part.

Glen Echo is a warm season golf course. Our largest area of fine mowed turf are our fairways and tees which account for almost 30 acres of warm season grass, mostly zoysia. The bermuda grass which I have a love/hate relationship with is required to help round out our course and fill in where we have voids in cool season fescue, poa annua and bent grass which invades our rough. The long cold winter has slowed its emergence in higher traffic areas but warmer temperatures are beginning to help it fill in where we need it.

There were enough gaps in the rain during Stanley Cup winning week so we could apply fertilizer on the fairways/approaches which will improve green up and also begin to help the turf fill in as needed. Most areas where we have needed to replace turf in fairways occurred from some of our bermuda eradication work last fall and some winter kill of both bermuda and a little zoysia. Also we experienced a few thin areas in north to east facing slopes 10 and 12 approach and also from excessive shaded conditions.We still have a few more places to do some sod patching on fairways, intermediate, and a few green approaches and surrounds. As temperatures increase which increases soil temperatures, this will also speed up growth of our warm season grasses. We did modest fertilizer application around the greens to improve fill in of the bermuda and give the cool season turf just a bit of energy to fight through the rest of the summer. We will do some additional spray-able and granular apps along weaker fairways and around all fairways in the first pass of the rough.  This will improve color and thicken the rough for the summer. Oh joy he's going make the rough rougher, yes, yes I am.

I think overall our rough is about in the best shape I can remember since arriving in August of 2008. Still fighting some weeds in various parts but are getting some good kill throughout the property. applications.


We had hoped to begin aerating fairways on Monday but it appears we will be too wet. We will try next Monday on our closed day which allows us to get a full day in. We will also do some individual fairways this upcoming week if we begin to dry down.The fairway aeration program should improve the turf in a number of ways:
  1. Reduce thatch through increased microbial soil activity
  2. Increase water penetration and drying down in wetter areas
  3. Assist with disease management including fairy ring
  4. Stimulate turf growth
  5. Reduce compaction in our fairways soil
  6. Breaking of the cores will help to fill in small imperfections in  surface areas.
Russ mowing 2 fairway.
From behind #2 green

The course continues to tighten and improve as we work our way into the first week of summer. Tree trimming, tree removal, sodding, aeration, and just general clean up of all areas are ongoing 

 I've included a Countdown Timer on the main page of the blog for the upcoming Invitational Member/Guest coming up in July. Amazing to think we are less than 30 days away from this great event.

Tuesday, July 30, 2013

Aeration information/updated video

I did some editing of the original video from last week's aeration work and placed some short clips of the rest of the process at the end.  I will try to incorporate more video in the blog as time allows.   Maybe purchase a camera instead of using my phone which is convenient but does not make the best movie clips. We still have just a few things to aerate. 6 approach as well as a few more of the last 20-30 feet of some of our greens approaches will still need some work.  The long range tee needs to be cored and will still plan on doing a solid tine to both our warm season and cool season tees.

Monday, July 22, 2013

Fairway Aeration Day 1

Darkness is falling on Glen Echo and our fairway aeration has been completed for the day.  We were able to get through hole #13 today.  Sounds like the weather is not great for trying to knock out maybe #15 and another hole tomorrow but we will see when we get up in the morning.

Check out the video below with some discussion of the work that was accomplished today.  I will have a little more time to put together some additional details for you over the next couple of days.  I was kind of right in the middle of the action today so not a lot of time for pictures etc.

Tuesday, August 21, 2012

Fairway Aeration

The front 9 was completed on Monday and we will work in the holes on the back as play allows over the next few days.  I was considering not aerating at all this season due to the drought and high heat but a reduction in the temperatures over the last 10 days and an open golf course on Monday for the first time in 3 weeks gave us the opening we needed to get well over 1/2 the fairways completed.  We lose a great deal of time during the morning with heavy dew/wet conditions.  The total process takes about 1.5-2 hours per fairway when the ground is dry but can take as much as 3 hours during the early morning hours.  Even though we used our rough aerator and did not use a close spacing fairway unit, we will still get some benefit from this aeration..

Our process included the following:

  • Aerating the fairway.  
  • A flail mower is used to break apart the cores.  The flail unit is fairly descriptive in how it works.  Paired spinning blades drive over the cores breaking them apart. 
  • A drag is then used to break the remaining cores and help spread the dirt throughout the fairway.
  • Tractor blower than blows the tufts of grass and excessive dirt across the fairway and into the rough.  
  • We then finish the job off with mowing.

Aeration plugs lying on the fairway.  Normally we would have twice as many holes from 3"x3" spacing but our rough aerator is 6" x 6".

Skip using the flail mower to break up cores.

A view under the deck showing the multiple rows of small  2 3/4" blades in pairs staggered and spaced  to break up the cores.
Reggie dragging the remaining cores that do not get chopped up all the way.
 
Finished fairway after mowing.




Wednesday, August 10, 2011

Fairway aeration

We completed fairways 1-5, and 7 on Monday and did holes 17-18 yesterday morning.  We plan to complete the remaining fairways on Monday.

The process included:

  • Mowing the fairway
  • Core aerating using a 5/8" tine.  
  • Ground the cores with a flail mower which turned a majority of the material into powder.  
  • Drove a cart with a drag mat over the remaining soil, cores and grass tufts to assist in moving the material down into the profile.
  • Used a blower to remove the remnants off of the fairways.
  • Mow the fairway.
This process takes between 2-3 hours depending upon the size of the fairway.
Russ with our aerator.

Jason using the flail mower to grind up the cores.
Tom dragging the remnants to move the soil into the profile and possibly break up some additional cores.

You can see the cleaner path created by the blower removing the material off of the fairways.
Harry, beginning to mow #7 fairway.  Still a dusty operation.


Sunday, August 7, 2011

Fairway Aeration

Of course rain would be predicted on our aeration starting day.  We plan to start our fairway coring tomorrow.  Our process will include pulling the cores, grinding the cores, blowing off the remnants and mowing the fairway.
We will do as many holes as the rain allows us to do tomorrow and will finish up our task next Monday.  Additional postings will be made during our process.

Tuesday, August 17, 2010

Fairway aeration complete

Completed the last 4 fairways on Monday.    Still need to do the nursery but that will not effect play.  Speaking of the nursery.  Last year's zoysia sod that was removed has filled back in completely.  I would think the area will be able to be used again after next season.  Most sod farms return their removed areas back into harvest by the second year.  Our process is slightly slower than our sod producers. 

Coming out of winter we were concerned about our zoysia and yes bermuda but it has been the best season in a long time for warm season turf.  The tees and fairways have been pretty spectacular since the 4th of July.

Thursday, August 12, 2010

Fairway aeration work

With our schedule disrupted from weather and mechanical issues, we continue to get our fairways aerated a few each week.  #2,3,4,5, and 16 were completed this week which leaves us with 7, 10, 11, and 12 to complete which we plan to finish on Monday.  What should have been a two-three day process has been pushed into nearly 4 weeks but the fairways are recovering nicely and will be in great shape for the fall.  The middle of August is the latest we want to aerate zoysia so it has enough time to recover before dormancy sets in by late October.

Wednesday, July 21, 2010

Fairway aerating, 2010

Our fairway aeration started out on a promising note but ended with a thud a little after noon on Monday.  We were able to complete two fairways, #1 and #13 and got to the point of mowing #15 when the rain started.  We thought we had until afternoon before the rains came but a storm popped up in the south and delayed any further work for 2 hours after we had aerated #1.  Once the storm skirted by to the west, we began to aerate #13.  We completed #13 and was in the process of finishing the dragging of #15's cores when the rains came out of the north.  #15 still has some clean up remaining but is playable.  Rain on Tuesday and overnight has delayed any efforts at getting the fairway mowed and cleared of debris.

The aeration of our fairways has a number of benefits.
  • Reduces compaction to our zoysia which do not thrive in compacted soil.
  • Compacted soils do not allow water to penetrate into the soil which would require irrigation to be used on a more frequent basis.  The holes help water penetrate more deeply into the soil until the soil is to the saturation point.  The small reservoirs made by the aeration holes provide a quick inlet for water penetration.  
  • Reduces surface moisture which allow carts to be off trails much more quickly after a rain event and provides for a better playing surface.
  • Reduces thatch that can build up in areas encouraging disease, reducing water penetration and tying up nutrients.
  • Improves zoysia rooting and allows for more oxygen to penetrate into the soil.
Excessive rain and an equipment malfunction will delay our aeration until Monday, July 26th.  I would expect that we will have a couple of additional fairways to complete on Tuesday, July 27th.

I've got a couple of pictures to share with you regarding our operation.  I did fail to take a picture of the actual aerator working but I do have a link to last years video that I made of the aerator in action.  

http://geccgcm.blogspot.com/2009/07/fairway-aeration.html

Cores are pulled by the aerator and then we take a metal drag with pallets laid on top of it for weight and drag the cores to break them up.  We then take our fairway unit and mow the fairway because the turf has been forced to stand up and there is still some cores that did not break completely.  This is a very dirty job as you can see Russ has a towel over his head and glasses on to protect his eyes.  When the material gets very dry, you usually have to wear a dust mask around your face as well.















Once the material is mowed, it looks like the picture below.  A lot of clipping and some dust and dirt from the cores that have been broken apart.














Skip and Tom are double teaming the 13th fairway with our blowers before the rain arrives.  Rain was beginning to fall when they completed the fairway.














The view of #1 after the fairway has been aerated, cores broken apart, mowed and blown free of debris.














#1 Fairway 2 days later.

The view looking down upon the newly completed #1 fairway.  The spacing is about 3" apart to a depth of about 3".  I would expect the holes to be completely covered by turf within this week.

Wednesday, July 29, 2009

Update on fairway aeration

Our fairway aeration has progressed over this past week. We completed 9 more fairways on Monday and Tuesday. Another slight technical issue delayed our efforts three more hours which probably would have allowed us to complete our job. We have 5, 8 approach side, 11 and 12 to complete. With rain happening on Tuesday and more predicted for Wednesday and Thursday, we will finally complete the last couple of fairways next week.

Sorry for the inconvenience this has created but things are cleaning up pretty quickly. Once they are mowed a second time, the playability is much better. Looks like heat is coming in a gain late next week so they should close up rather well in the next 7 days or so.

I will post some interesting pictures of the dragging, mowing and blowing off of the excess material next week when we finish the remaining holes.


The fairway picture below is #18 which was completed on Tuesday 7-28.

























The picture below is Hole #1 which was aerified on 7-20. A week makes a big difference.

Tuesday, July 21, 2009

Fairway aeration

Every summer the fairways at Glen Echo are aerified. We use a Toro fairway aerifier which pulls a core approximately 4" in depth, 3" apart with 36 tines. It takes approximately 2.5 hours to complete the process per fairway. The aeration takes about 1 hour depending upon the size of the fairway. We use drag mats to break up the cores. We then use a fairway unit to mow the remaining cores and turf that has been stood up from the drag. We then finish off the process and blow some of the extra dirt and dust into the rough.

Our aeration was going well on Monday, July 20th when we had a mechanical problem and our machine was down for the week. We only were able to aerify holes 1, 2, and 13. We will begin to aerify fairways again on Monday, July 27th. We might have one or two more to complete on Tuesday and Wednesday.

Below is aeration process which I made a video to show how the unit works. I only have video for the aeration part of the work. I will make an additional post next week showing you the rest of the story.(Please excuse the narration at the beginning. I think I was a little tired from the week before. Thought I was listening to Foster Brooks for a moment for all you Dean Martin fans.)