Showing posts with label bent grass. Show all posts
Showing posts with label bent grass. Show all posts

Monday, March 13, 2023

Greens Aeration



 Well, we've survived winter or have we. I bet if you asked our crew who spent 11 hours out on the course today that winter is still in full force but the promise of better weather is ahead. Oh it was a cold  aerating the PG and greens 1-13 today. We anticipate completing greens 14-18 on Tuesday.

Most modern greens consist of 12” of sand, 4” of pea gravel and drain lines cut into the soil subsurface with 4” slitted drain pipes that help to evacuate excess water from the root zone. 18 of the 19 greens at Glen Echo are sand capped which means there is a 4-6” layer of sand on top of the soil layer with no drain tile to move excess water from the root zones. 

The water that penetrates our greens evacuates in 2 ways. The first is moving down through the sand cap and meeting the soil layer. It will then flow with gravity out away into the green surround area. The second way our greens drain is through the holes we have placed in our greens over the last 20 years or more that penetrate into the soil layer. We then back fill the channel with sand which allows for additional water to move through the root profile and drain into the soil layer. We have placed thousands of holes into this soil layer to assist in removing excess water.

Below is a description of today's process with a couple videos and photos to show your our process.

The tines we use are 1/2” in diameter and penetrate to about 8” in depth.  

 Before we do the aeration work, we place a layer of sand on the green surface. This is done ahead of time to reduce the potential heaving of the green surface. If you aerated and then pulled a machine across the surface with a load of sand it would put some waves in the green surface.

We put approximately 1500-2000 pounds of sand per green depending upon the size.

 https://youtu.be/pb-eGeIe7Jc

 

 https://youtu.be/4fgH3jTjPV0


We apply a micro nutrient granular product to our greens and then move sand into the holes with a pull behind blower and backpack blowers.


We then drag the greens with a brush, roll them and fertilize with an organic chicken based fertilizer. The greens are then rolled and water is applied to begin to dissolve the fertilizer and settle the sand.

We have a second aeration planned for next week which is contracted out. I will explain this process next week but it’s used in place of the common proactive that is called core aeration. 

Our aeration process does the following for our greens:
  • Stimulates top and root growth
  • Sand assists in smoothing the surfaces and provides a fresh channel of sand for drainage and root growth.
  • Penetrates into the soil layer assisting in drainage for our greens.
  • Encourage microbial activity as the weather warms which assists in reducing thatch. The sand also assists in diluting thatch.
     

Friday, March 18, 2022

Pound the pavement, Pound sand, You talkin about practice!

 Well, its been quite some time since I've made a blog post so let's get after it. 

POUND THE PAVEMENT

That's been my phrase since I became motivated to change my health regimen at the beginning of December. Thirty pounds lost with a goal of another fifteen over the next few months. Diet generally has changed with throwing wheat out of my intake. Pretty difficult initially when I consumed 6-8 servings a day which a majority of it included bread, donuts and cookies. Active here at the club and on my job but a lack of control and will power with food intake has been an issue forever for me. Hopefully, after discussing potential retirement in just a few years, its time for a permanent change in healthy eating and some regular movement away from the job.


POUND SAND

Over this past week we have brought in over 60 tons of sand to place on and or into our golf greens here at Glen Echo. We contracted with a company to perform the Dryject operation on our greens and begin to do our deep-tine solid aeration using our Verti-drain aerator. We used about 35 tons of sand in completing this operation.


Dryject machine injecting sand with a 3000 psi bead of water and sand into the green about 5". You can see the staff filling 5 gallon buckets of dry sand to load the machine. It takes about 2 buckets or more across the green before it will run out.

3 x 3 spacing after completion. Greens were brushed and rolled after this picture was taken.

We are planning on deep-tine aerating our greens on Monday, March 21st. We do not all of them completed in one day so decided to get some of the greens completed this week. We did greens 15, 17, and 18 on Wednesday and completed greens 5-6, 8-9 on Thursday. The aerating process included the following;
  • Sanding greens ahead to reduce tire rutting
  • Aerate greens
  • Apply soil enrichment fertilizer
  • Blow sand in holes
  • Brush greens and change holes
  • Roll greens and apply an organic fertilizer

Skip apply a heavy coating of sand on the greens before bringing the tractor on the green and punching hole. Takes about 2 loads of sand per green, approximately 2 tons.


Russ using our Verti-drain deep tine aerator on our greens. 3" spacing approximately 7-8" deep with 1/2" tines.

Staff using our new articulating blower and backpacks to move sand into the holes in the greens.

YOU TALKIN ABOUT PRACTICE


Pro shop purchased 8 new mats for long range wet, off season practice area. Our staff power washed the concrete, removed the old mats and installed the new mats. The mats accept a regular tee so you will not have to hit from the rubber tees. We are providing a rubber tee on the mat for anyone who does not want to tee as high as a standard tee. These will also be available for groups to hit from as well during our tournament season. I've included a video regarding the new mats as well as a discussion regarding when will be opening the grass tees. Probably will be at least a month or more. 



Thank you for being a part of this great club. We look forward to the upcoming season of golf here at Glen Echo. Remember you can follow regular daily updates on Instagram, Twitter and Facebook regarding the property we manage for you. I will give you as many details as you can stand.


 

Wednesday, May 26, 2021

Spread It, Vertical It, Trim It, Fill It and Please DON'T Step Through It

 What a rollercoaster its been over the last few weeks with our work here at Glen Echo. This week we're reaching the peak and heading down the biggest drop. All of our grounds responsibilities are coming together to start all at once but our staff along with some pretty good weather I must say are knocking it out of the park with a couple twisty loops in between.

SPREAD IT

The pandemic has created some shipping issues with parts in repairing some of our needed pieces of equipment. Our spreader is down and with the onset of warmer weather our zoysia is hungry and ready to move a bit so we borrowed a spreader from the best Super I know, my brother and spread a couple tons on our fairways over the past couple of days. Little more spreading to do as well with a little nitrogen to go into the roughs to push a little energy into them for the summer stress period. Oh what a challenge it will be playing from it over the next few weeks! Hit em straight.

https://youtu.be/pXnd4mWMpLg


VERTICAL IT

Did a little vertical mowing on our greens the last couple of days. Its normally completed a little earlier in the season but timing has not been where I wanted.  You say vertical, what do you mean? Well, allow me a moment to explain. Greens mowers have a piece of metal that stretches across the ground and stands the turf up and the blades then come through and cut it off. We are talking about a setting of about 1/8" maximum which is about 30 sheets of typing paper. Pretty thin. Below are pictures of a normal mowing reel and a vertical mowing reel.


Regular mower with a straight bar across the bottom that stands the blades up and anything above the top of the bar gets cut by the spinning blade.

The vertical mower cuts down into the surface of the green. 37 blades across 20" spaced at about 5/8" apart. Its purpose is to cut any bent grass in its line that have bent over and grown laterally which is its nature.


Our vertical mowing only goes about 3/8" deep helps to manage the bent grass in the manner that I anticipate. We went front to back on Tuesday and today we went the opposite direction and made what appears to be a checker board pattern across the greens to insure we could cut many of the longest blades. Tuesday we did a light sand topdressing behind the vertical mower than brushed and mowed. Today we only brushed behind the vertical cut and mowed. The disruption of the surface lasts a few days but I would anticipate by this weekend the greens should be at their normal roll out.

https://studio.youtube.com/video/eIUkyFNgzjw/edit






  The arrow on the left is pointing to the shorter lime green poa annua.We have reduced its competitiveness with a growth regulator called Paclobutrazol in an effort to encourage the bent grass to out grow it. The arrow on the right/middle is pointing to bent grass plants which if you look at the length of their overall leaves are 3 to 4 times longer than the poa and much wider blades as well. We don't vertical very often because it can reduce the competitive advantage bent grass has over poa but a cut like this can stimulate growth of the bent and force it to push out more leaves from the crown(growth center of the plant). Ultimately it improves ball roll out for future rounds of golf. Now you can go to a depth of an inch or more but that's usually done much earlier in the season to allow for proper healing. Scheduling had not allowed us to get this process completed in the last few weeks but the timing of the cool down over the next few days works perfectly for this cultural practice. 
 
TRIMMING IT

The staff have been hitting the property with trimmers attempting to get all trees, fence lines and other structures trimmed up over the last couple of weeks. They are weekly trimming and hover mowing our bunker banks which is usually a 6-7 hour job for 3-4 people. Once the heat of summer arrives, there is a bit less growth which saves some time. 

FILL IT

Our grounds detail work as we've mentioned in the past are our tennis courts and pool. Continued clean up including painting the asphalt  area and getting the shade structure painted and cleaned. Cleaning  stored away furniture and existing furniture that overwintered at the pool. Becky's been hard at work getting the urns filled and the giant hanging baskets placed at the pool. Touch up painting of the pergola and attaching the sunshade to its roof all in a days work for our staff. 


 We removed some hanging baskets from the Pro Shop front area and have added some new baskets to the Field Bar. Becky planted those last week with Caladium, Sun Patiens, Asprargus Fern and Coleus. Six in total. Should be a good look this season.


 
Please DON'T STEP ON IT

Speaking of Becky and the work she does comes the last but not least of our blog. We have a couple of ornamental plantings that are in some high traffic areas, especially around the pro shop. They were put in place over the years to give a great back drop to our closing hole and to give cart and walking traffic a defined area to walk and or drive around. Last weekend, I happened to be up around the pro shop and saw with my very own eyes people walking directly through the bed area. 
Our walk on and walk off area at the practice green was an embarrassment for me and we have made great strides in improving this area. We improved the soil structure and increased the irrigation to small directed heads for this walk off area. We also placed stakes and roping that can be moved to spread the wear and tear. Every foot print through the ornamental bed compacts the area and does not allow water to penetrate properly and damages plants. We appreciate you walking a few extra feet to protect the work our staff has spent many hours completing.
     


Thanks for your time and hopefully you get out and see  us over the next few days.


Thursday, March 18, 2021

Drain/Cover, Restrict/Educate and Pound Sand

 Well, it appears we are coming out of winter in pretty good condition generally speaking. All of our turf has not awakened but I am seeing a tinge of green in some of our zoysia areas. We still have to see if some high traffiked areas are damaged from foot and or carts. More on traffic later.  

DRAIN/COVER

The drain and cover part our blog would not have occurred without some dry weather at the first of the month. This allowed us to make great progress on the drainage project from 6 cart path all the way down to 8 cart path. We finished installing of our small drain lines and covered as much as we could in sod. Over 1,800 yards of zoysia and fescue were laid in various areas. The front of 6 green approach and 8 fairway were covered in zoysia. The left rough on 8 and a few strips along the drain line in front of 7 tee were covered. The remaining areas still need some additional soil and a little bit of settling time.


Laying zoysia sod in front of 6 approach. 30 yard rolls.

After adding some additional soil to the left of 6 green Skip is smoothing it out. Still need to add more dirt to the area and more grading once the rain has stopped.

Some finish soil to help smooth out 8 fairway drainage site.

Skip grading on 8 fairway.

We used the forks on the box to break up the soil surface. We then graded with the box blade finished graded with our bunker rake. Our sod producer who was one of the owners of the company complimented us on our finish grade work. Sorry, for some reason didnt take a finish grade picture.

Big roll sodding 8 fairway.

Almost complete, had to bring in more zoysia the next day with the fescue.

Looking from the green side of 8 across the zoysia.

Big roll fescue going in on the left rough.

From 8 cart path looking across toward 7. Just waiting on some drier and warmer weather weather to get this area opened. It will need to firm considerably before we open it for play.
Signage and ropes asking you to avoid these wet areas at the bottom of 3 green.

Looking across 8 near the intersection of 7 tee cart path. With exposed soil above the newly sodded area, we decided to put some hay bales across to catch the soil from washing down on the new sod until we can get it covered with grass. Bottom right foreground are a few stips of fescue we had left over from 8 rough that we laid on solid ground that was not disturbed except from construction traffic ..

RESTRICT/EDUCATE

With the warm weather comes an increase in cart traffic. With increased cart traffic comes the need to restict cart traffic to slow the potential damage to emerging turf which is slow to awaken from its winter slumber. I made some soical media posts regarding cart traffic and the damage that can be caused from excessive wear. I thought it would be important to include it as a part of the blog post for those of you who do not follow our social media accounts.

We have various areas of the course which have springs coming out of them until the summer. There is of course just regular water weeping for short periods of time after heavy periods of rain from slopes into lower lying areas like illustrated below on 3. We have cart signs and ropes in areas on #3, #12 and #13 at this time. There could be other areas that develop over time that we will monitor and might have to place additional restrictions.


3 Fairway directing carts around wet areas next to hill side.

We have a number of holes that have permanenent stakes and decorative rope to force traffic to stay on the path until arriving past the starting points of the fairway. In most cases, carts should be driven on the path and then turn 90 degree into the fairway. Going directly from the teeing ground straight through the rough into the fairway creates signicant wear and tear at the beginning of the rough and fairway. 

Many are using these areas like they are interstate on ramps. 

We understand if you hit a shot that is short of the fairway. Its okay to take your cart to the ball and then move to the fairway. Golfers in carts are kind of like cattle and or dogs, They walk or drive the same trail, walk along the fence the same place without thinking of the damage that is occuring. Excess wear and tear costs money and time in renovation and makes the course not look its best. 

This is a pirme area of concern off of 3 cart path. The path comes straight down the hill and turns to go alongside of the fairway. The area at the bottom of the hill has a tendency to be a little wetter than other areas as well. You should not drive straight through to the fairway. 
No means NO CARTS proceed through this area. Carts should remain on the path and then turn left somewhere past the drain area to go across to your ball laying in the fairway. If its over in the left tree line, you can still cross the fairway at a 90 degree angle from the cart path.
Area at the start of eight fairway is roped off to reduce wear and tear. We have also roped off areas on  four, five and seven. As you might not be aware, this takes time away from 
the mowing team as they are mowing the rough. You have to get off your mower, take the stakes down, mow through and then get back off the mower and put them back in place. At times, a manager will be doing other things and will stop in and help remove the stakes but it takes time. I like the natural look of a course and don't like to have to put up stakes and signs but this is something we are forced to do if we want these areas to look good.

Please assist us this season in reducing cart traffic issues by following a 90 degree rule as often as possible.

POUND SAND

No, were are not saying get lost. We are pounding sand into our greens to improve the overall growth of our greens both above and below surface. Our contractor arrived on Tuesday and used three machines to do this work. Cloudy and wet conditions slowed our process but we were able to complete all nineteen greens by the end of the day. 

Dry sand is injected into the surface of the greens with a bead of water with a force of 2-3000 psi. The work is completed on 3"x3" centers. It takes about 10-15 gallons of sand for each pass on the green. Our staff had to move about 40 tons of sand in 5 gallon buckets at a time to fill the sand hoppers on the units. We normally brush and roll the greens but we had to wait until Wednesday to complete this operation. There area a number of benefits in doing this process;
  • Opens the surface of the greens to improve infiltration of moisture into drier areas and allows wetter areas to dry more quickly
  • Allows sand to be injected into the green mixing with the thatch and assisting in its control
  • Provides new pathways for roots to grow and branch/spread
  • The sand expands out wider than a normal 1/2" aeration hole as it reaches the 4-5" range of depth
  • There is not a lot of excess sand on the surface which is a positive of the process. The remaining sand is brushed into the canapy which improves protection of the crowns of plants and also helps to smooth the greens surface.
Below is an illustration from the Dryject website on how it works. Further down the page is a quick video of the process. We also intend to deep tine our greens to about 8" if the rain ever stops. We might be forced to do this over a number of days and do it when we are open. We will do everything we can to not inhibit play  I wll keep you informed as time goes by when this process will begin. This double aearation process is necessary to help improve the drainage in our greens.
























Thursday, March 21, 2019

Collar/Approach Renovation and Bunker Work

The staff has had busy week. We removed the false front bent grass approach on #10 and used the bent for collar repairs on holes 3, 4, 5, 6, 18 and the practice green. Over the last few years we have been converting these approaches to zoysia grass.  There are a number of reasons that this is being done:

  • Less chemical applications since the approaches are now zoysia. This will reduce our overall chemical use which is good for the environment.
  • Zoysia requires less water which will make the approaches more firm and allows the ball to release forward onto the green instead of hitting the more heavily watered bent grass approach and stopping.
  • Our collars are mowed with a walk mower which takes more time to mow than the riding mower we can use on the approaches. We have converted them to a single pass mow which reduces labor which can used on other areas of the course. 
We still have larger approaches on 7, 13, and 15 that will be completed over the next couple of weeks. We reduced the size of 2 and 11 a few years ago but they are still larger than the single lap collars we have converted. We will attempt to remove these if time allows. If we run out of time, they will be worked on this fall.
Laying zoysia sod on 10 approach. This sod was taken off of 2 tee and used for this new approach. Saved operation a full pallet of sod which costs about $ 300 including delivery costs. It does take extra effort to do it this way with cutting the sod, lifting it and laying it but its great to use turf in another area.

Staff continue to lay more sod on 10.

This is a before with the old bent grass being stripped off by the sod cutter.Tom is cutting the bent grass sod into pieces so it could used again on damaged collars.

Staff in front of 3 green on the collar removing bermuda infested and thin turf.

New bent grass sod in its place. We saved nearly 400 linear feet of bent grass to use on our collars.

The guys are finishing up the left side of #6 green collar.



This morning the staff began working on our bunkers. Currently they have completed edging and redistributing sand in bunkers on holes 1-8 and the 2 large bunkers on 7. We will attempt to get the rest by early next week. The work has included adding additional sand to each bunker as needed from checking depths. As a player, you should expect that the sand will be a little fluffy in the bunkers that have been worked. It will take some time for us to get the existing sand to be mixed in with the new sand. We will be taking our packing machine out after heavy rains to help firm up the surfaces over the spring season.

No, not a Fox digging holes. These are check holes to see the depth of sand in the bunker to determine if we need to add any sand to the bunker or distribute deep areas of sand to more shallow areas.
Bermuda grass the was removed from normally the lower side of each bunker. Over time the bunkers shirk in size due to this fast growing plant.
Sand waiting to be added to the bunker on #1.

Newly added sand being shoveled and raked on #1.

Completed bunker on the left of #6







Friday, February 22, 2019

Between Now and April 1st We Must All Do Our Part

This has been one winter that has forced many of us to leave for warmer climates or dream of warmer climate if you haven't been able to leave the city. We've not been able to open the course on warmer days because of frozen conditions within our greens. We finally opened today for the first time in many weeks. We could have some additional course closed weather days before we begin to mow a great deal but they should be for much shorter intervals than what was experienced over the last month or so.There are a few things that our golfing members could assist us during the next few weeks until the turf begins to firm up and grow and we are fully staffed in April
Middle of 6 White tee concentrated divot wear. Please use the edges when possible.
  • Greens will be very soft and repairing ball marks would be helpful.
  • Divots on tees and fairways could be large due to the soft, wet conditions. Place your divots back in place, even if it breaks apart. Also, step down your depression which will reduce the exposure of roots to cold and or windy conditions. Your competitors would appreciate it as well in case a ball would roll into your smaller stepped down divot. Of course this is helpful during the growing season as well.
  • Tee markers will be placed back on the tees in a few weeks but in the mean time use areas of the tee that appear more full of grass, especially the sides. Please don't place your ball in the middle of a heavily divot spot to make one more divot. Place your tee in an area of less damage.
  • Carts will probably remain on the paths for the near future and I would encourage that you leave all wheels on the path instead of pulling partially off the path. I know if you are in a group with 2 carts, you have to go around a parked cart. If you do pass, it is always best to go on the side of the path away from the fairway so you do not potentially damage rough in the close rough/fairway area. Certain areas of the course are wetter than other areas, especially bottoms of fairways. It might be wise to wait for the group to move instead of burying your cart in a wet spot at the bottom of #12 cart path.
  • Driving ranges are on mats through at least mid-April or later. Please refrain from hitting off the grass tee. If you must hit off grass, please go to another range until we can get our grass growing and open. I don't like to hit off mats as well but its what we have to do since our grass is not actively growing until late April. The less damage we do to our grass now, the quicker we can open in the spring.
Olympic Flame troubleshooting
There is a great deal of work for our staff to complete before we reach the month of April as well. Not a complete listing but some of the main work.
  • Finish all the equipment repairs for tees, driving ranges etc.
  • Clean up of all equipment and checking carts for the season
  • Continued tree removal and tree trimming.
  • Rake and clean up gum balls and other debris
  • Blowing remaining leaves that have dropped and finishing fence leaf removal.
  • Monitoring seed head production on greens and spraying.
  • Dry-ject(aerate) greens March 18-19 45 tons of sand.
  • Aerate rough and root prune trees
  • Finish applying weed grass post and pre-emergent to fairways. tees. Walk spread pre-emergent around greens and apply by fertilizer hauler pre-emergent into rough areas.
  • Repair greens surrounds with sod and other areas of course with sod and seed.
  • Clean up tree stump grindings/sod
  • Repair driving range netting by installing new telephone pole.
  • Changing holes, moving tees a couple times a week as needed.
  • Repairs to outside areas around the clubhouse including walkway lights, patio lighting, pool clean up and lawn areas.
  • Asphalt repairs as needed.
  • Growing all of the plants for this season and Becky will be busy cleaning up beds and planting spring pots around the clubhouse.
  • Clean up in and around field bar]
  • Rebuilding 2 tee
  • Rebuilding the greens nursery
  • Grass part of dam on #9.
  • Divot filling
Repairing and painting driving range bag stands. These were all home made by the staff a couple of years ago.
As you can see, we all have responsibilities that are important for the overall well being of our grand old golf course. We of course first rely upon you to come out and visit us, first and foremost but while you are here, some player etiquette in regards to the course is always appreciated.

Thursday, October 4, 2018

Collar Renovation

Over the last few weeks, the staff have been chemically treating our collars in an effort to weaken the bermuda grass that has invaded them. We've made 2 applications of a product called Pylex which is safe to use on collar height bermuda. Today, the guys are renovating the collars and planting some bent grass seed around each collar. The overall process will not be completed until next spring. It will take the bent grass plants time to mature and spread. We wll have to also continue our bermuda grass sprays next spring and will have to work our way off the greens to reduce the amount of competition that enters the collars in the future.

The process we used today is illustrated below and in video as well:


  • Used our Toro Walk behind aerator to place small and shallow holes one pass around each collar.
    10 small tines per holder. We are using 3 sets on our machine which is about the width of the collar.

    As you can see, my pinkie still dwarfs the tine. The tine goes into the surface no more than about 1/2" which provides enough room for the seed to drop in and be protected from a mower and adverse weather conditions such as high temperature.

    The remaining process will be illustrated in a couple videos below.
  • We then use our walk behind slit seeder to slice some lines into the collar creating a slight channel for the plants to germinate and mature.


  • We then take a drop spreader with some sand and bent grass seed and drop it onto the collar surface. This is to insure we get seeds into the open spaces and the job saver tine holes.



  • The collars are then hand brushed with a stiff broom and they are mowed without baskets to insure the bent grass remains on the green or collar edge.