We started filling the ground stump areas with top soil today. We will allow the material to settle some over the next week or two. We will then smooth the area again with a finishing layer of soil and will cover with sod.
Loader filling up the cart with soil.
Backing up to the hole and dumping the load into the hole.
The hole topped off and soil stepped in lightly.
No comments:
Post a Comment