The large box culvert along #1 was completed last week. Soil is now being hauled in to cover the box. The contractor has estimated about 1800 yards of soil to be hauled in to cover the pipe. Approximately 150 truck loads will be required.
Once the soil has been delivered, we will begin the process to expand our fairway/rough, install our catch basins, improved drainage on the lower side of the fairway, widen the fairway landing area and change the mounds to a more historical look from our course's great heritage..
|
The new box culvert installed along #1. |
|
Additional look at #1. |
|
The view along the ditch toward the driving range. |
|
A dump truck delivery soil so it can be filled along and over the box culvert. |