The remaining sod was installed on Wednesday on the right side of #1. The remaining zoysia fairway spot was covered as was the rest of the road up to our maintenance building lot. The asphalt near the employee parking area to the back gate was replaced.
The only thing left to complete for this project is the wire mesh for the fence along #1 which is to be accomplished on Tuesday.
|
Old asphalt lifted from back drive |
|
New asphalt installed. |
|
Missouri Turf installing new fescue sod for old construction roadway near #1 tee. |
|
The finished product. Looks great! |
No comments:
Post a Comment