Day 21 was a good day for the staff today. Blustery with some light rain on and off a today but we were able to get some work completed. The left bunker on #13 was trenched, dirt removed and sod laid on about 1/2 the bunker. The right front bunker of #13 was trenched and soil cleared away. On Saturday, we will finish grade and clean up the bunker and will trench and clean up the right rear bunker in preparation for drainage install, sand and sod. I expect that all 3 bunkers will be ready by the end of the day on Monday. We also dug out the sand and removed the sod from around the two bunkers on #17.
Kye did some finishing work on #3 and moved to #17. He has completed most of the work on the left side bunkers and removed and smoothed the area from the old front bunker. We did decide split the bunker on the left side into two bunkers because the size of a single was just too large. I'm not sure if he will be working on the right bunker on Saturday but will be completing his work by the middle to end of next week if the weather holds out. He has the right bunker on 17, the bunker on 12, the bunker on 1, the two bunkers on 6 and the practice bunker and his work will be complete.
I hope we can complete the bunkers on #13 and then move back to the bunkers on #5 and #4 if they dry enough this week.
LETS GO BIRDS!!
|
#13 Left bunker sodding. |
|
#13 left bunker drainage trenches. |
|
#13 right front bunker drainage trenches. |
|
#17 sod and sand removal. |
|
#17 left side bunker shaping. |
|
#17 bunker shaping. |