Drainage leading out of the right front bunker. We had to use the large backhoe to trench a line out to the sump hole that you see below. |
Drain lines filled with pea gravel waiting for sand. |
Staff spreading the sand in the right front bunker of #4. |
The right side bunker complex which will be completed on Friday. |
Trenched lines through both left bunkers of #17. The soil will be remove on Friday . |
No comments:
Post a Comment