The beginning of the box culvert being readied for installation into the ditch. The large trackhoe is preparing the ditch bottom where the pipe will be laid. |
Maintenance & renovation practices of one of the oldest 18 hole country clubs west of the Mississippi Host of 1904 Gold Medal Matches in the Olympics
Wednesday, December 7, 2011
Metrolink Project
Pipe being installed in the driving range section of the project. Tub grinder is to arrive this week to grind up the mound of trees, brush and stumps that were removed from the construction area. The ground material will be hauled off to a composting facility. I would use some of the chips but there was a tremendous amount of junk trees and brush that were pulled out so the material would not be good for our use. Once mixed and properly composted at a facility, it will be reused by people throughout the metro area.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment