Showing posts with label new sod. Show all posts
Showing posts with label new sod. Show all posts

Thursday, May 13, 2021

Yep its Weather, Getting Dirty/TIlling Deep, Zoning Out, and Early Range Shutdowns


 Its been a while since I've made a blog post. If you follow me on other forms of social media you've seen a regular plate full of details regarding the work our hard working staff are accomplishing on a daily basis.

Weather

First and foremost, lets talk about the weather, especially the colder than normal temperatures we have experienced in late April and May. The average temperatures in April were a couple degrees above last season. Now, May 2021 is a different story. We are currently 8 degrees behind average in both daylight highs and night lows. Last May we were actually a degree above normal. More importantly, our soil temperatures have dropped since the first of May to 63 degrees.

Soil temperatures at this level are excellent for our rough grass(cool season) and greens. Our bent grass likes temperatures to be slightly warmer, especially at night but they are in full production of energy which contributes to root growth and adds to storage within the plants. 

It is most difficult for our dominant short grass zoysia, especially our tees and areas of fairways with heavier cart traffic and additional shade. We've cleaned up our zoysia mowing only weekly at this time due to the lack of growth. Some of our weaker areas we will keep the mowers away completely. It appears we might begin to see some increases in heat over the weekend and into next week. We can't force the plants to grow. The systems within the plant currently are slowed because there is not enough energy to produce growth.

It is very important during this time that membership operating carts reduce traffic in fairways as much as possible. Using a 90 degree angle from the cart path to your ball in the fairway reduces traffic in the fairway. Once the ball is struck, move the cart back to the rough and cart path when possible and proceed to where you ball is located. We are still seeing a tremendous amount of traffic going from the teeing ground area directly through the rough off of the tee and into the fairways and then driving another 50 to 100 yards down the fairway. Your assistance is greatly appreciated to reduce this type of activity.

Soil and Sod 

Stumps from a few trees removed were ground a few weeks ago, remnants cleaned out and this past week they will filled with soil. Yesterday and today, our staff edged the existing filled areas and laid sod to cover the spots. Six in total were cleaned up. Our contractor will be out in the next couple of weeks to grind the remaining stumps that we have on property so we can get them cleaned and covered for the summer.

Sycamore and Sweegum that were in the club lawn to the right of 9 cart path were covered with sod. Also, 9 tee, a pine tree in the club lawn and in the triangle between 5/7/main drive. 

Some additional soil work was completed along some seriously compacted cart path edges behind 11, green, at 13 green and at the curve just short of 15 green by the 16th tee. We used a heavy duty tiller going as deep as 6-8". We added some black gold compost from St.Louis composting and covered with fescue sod. These areas will be kept very moist over the next week or two so it is important that we do not step into the 20" width of sod that are next to the path. Access to the green areas are still available at the top end of these renovated areas.

https://www.youtube.com/watch?v=No8JNhqkE78




From the 11th cart path going up the hill to 12 tee. We have this section roped off and are asking cart to proceed to the top of the hill at the circle turn for the 12th tee to enter the 11th green complex. This area has been very problematic because of the severe slope and the large Pin Oak that keeps this area  depleted from moisture and into heavy shade. Hopefully this extra work will finally keep this area in better shape.

This area leads up to 13 green. We tilled from just above the left tee up to the top of the hill in the bottom picture. You can access the green from below or above the section. Some can step across the sod without issue but please be reminded this area will be kept wet for a week or two to help it root properly. We will also keep the tees up on the upper tee of 14 for a week or more so more the reason to pull up to the top of the sodded area.


No pictures of 15 but this area will be roped off and will be obvious for our golfers. Carts can stop short of this area and or proceed to the circle for 15 green/16 tee.

Drop Zones

We have one established drop zone at the club which is the red teeing area of hole 9. As play has increased, so has the wear and tear to this teeing ground. It is also a fairly small tee with an extension that was added a few years ago that frankly speaking needs to be renovated. Teeing grounds are not the best locations for these drop zones so a couple of changes will be occurring over the next couple of months. 

On hole 9, we have rough graded in a new drop area beside the 9th red tee. We will be covering this with zoysia over the next week. Later this summer,(after July 4th, we intend to close the red tee and blue tee on #9. We will strip the sod from the tees, enlarge the red tee forward, to the right and a little off the back. We also will strip the blue tee and will extend its teeing ground to the right. We anticipate these tees will be ready for play by August 1st with the heat of the summer pushing a quick grow-in. In the meantime, we will utilize the new drop zone for the red tee/drop zone and the white tee will have the blue tee added.

New drop area to the right of 9 red tee. We still have some work to complete on the slopes and some leveling but its roughed in. We anticipate the red tee to split the different between the existing tee and the new drop zone.


        

The golf committee and green committee has been in discussion regarding a potential drop area to be established for the 15th hole. We will be placing a drop zone about 35' from the cart path about 10' from the Egan's Lake. It will be mowed at a reduced height of cut and a circle designating the area will be put in place. 

Driving Ranges

There are signs at each driving range that mention the range will be closed early on Thursdays. This must occur so that all balls can be removed by the pro shop staff and readied for our staff to mow before the first golfers whom arrive on Friday morning at 7 am. This program is usually implemented in late April and runs into June and or until the grass begins to slow its growth. Its important that the grass be cut twice a week so staff can see the balls and remove them so they are not chopped up by the mowers. 

On event day Mondays, our staff usually picks the ranges clean and mows after the groups begin play. The pro shop staff assists us with as much removal before dark on Sunday evenings. We do not close the ranges early on Sundays so our membership are not inconvenienced by our necessary operations. We appreciate your understanding during this time.


I hope you get a chance to get out and see your golf course over the next couple of weeks. Ball roll out has been pretty good I hear and hopefully the rain starts falling at night and leaves our weekends free to play golf.


 



Friday, April 5, 2019

2 Tee Renovation and a Great Deal of Other Work to Discuss

March 22nd and 23rd we did the rough in of the new tees on #2. Due to the movement of a great deal of soil and wet conditions every 3-4 days, we are at a pause in work on this project.
I would hope if we can get dry in the next week or so we will get the surrounding area of the tee finished graded and prepared for sod. The teeing ground will be tilled and laser leveled by Schaefer-Meyer we hope within the next couple of weeks and then sodded so that the tee will be open for play by mid-May.
View from the front of the tee complex. Tees are now set up as 2 separate tee boxes.
From behind the tee complex. Sorry for the poor pictures, just looks like a pile of dirt from this level. Had my drone in the air the other day to take pics and crashed into a tree. Once I finish the repair, I will give you an overhead view.


Being the largest group of maintenance folks on staff at Glen Echo, our crew has been assisting in other areas. We spent about 20 man hours power washing the pool wall both inside and out. Also power washed all the walk ways in the front of the building and a part of Pearson Plaza. The staff power washed some of Limestone window sills that we did not get completed last season. The staff  with some able bodied assistance have also been busy inside the pool area removing some over grown shrubbery and pruning others. We we were in the process of mulching the upper wall bed when our loader broke down earlier in the week. Once it is back up, we will finish the mulching of this area. 

We will also be power washing the swimming area of the pool and installing new drain lids and plastering in new frames for the pool system. We will be managing most of the mechanical start up of the pool this season. I attained my pool operator certification for the pool over the winter.

The staff have also been involved in stringing the patio lights and moving equipment to the patio since warm weather is on its way.


Randy power washing the walk way in the front of the clubhouse


This week the staff have been extremely busy with sod work. Over 450 yards of old sod was removed and replaced with both fescue and zoysia. HATS OFF TO THE CREW THIS WEEK!! Our loader was broke down and we had to load the sod into carts and then unload it from the carts.  Normally we place the sod right in the area of work so double work for the guys this week because of the repairs taking place to our loader.

We first completed the tree removal stump repair and root removal on the old tree near 11 green. This was replaced with fescue.


Area to the right of 11 green. A large amount of roots had to be busted out by hand using axes and shovels.
                                                       The finished area off the front right of 11 green.


We then moved to #5 left bunker area. This area has a number of contributing factors to its look. Small area with a great deal of foot and equipment traffic. Last year we tried to resolve some of it with walk mowing the area. Significant shade and drought is the biggest reason for its decline. A large Pin Oak is growing right in the middle of this area and robs it of sunlight and much needed moisture. We stripped the old sod away, trenched in some new irrigation heads that will hit just in this area. We aerated it and put in a couple of yards of leaf compost. The area was then dragged with a metal drag to break of the dirt turds and move some of the compost into the holes. Sod was then added. Should see some improvement we hope with new sod and the other work we completed. We still have some additional areas to sod around the tree and bunker and will complete this hopefully next week.

Tree on the left is a beautiful specimen set back in the proper area on the hole. Tree on the right is being over shaded and basically is growing on one side. Leaves, acorns, and other material fall into the bunker regularly. The shade and moisture depletion is significant.
This is the trench that is about 15' deep and shows the network of tree roots from this tree.
Small 2-3" long turf roots have no chance in a competition for resources with these trees.
Aeration completed so that we can then add compost to improve the soil.
Compost added to the area.
After the area was dragged with a metal drag. Cores busted and some compost moved into holes.
Staff finishing up the sod work. You can still see the weakened turf around the tree. It will be replaced in a few days.

Complete

The staff worked on the 13th approach today and also did a smaller amount of work on the 18th approach. We removed the bent grass sod, repaired part of the collar on 13 and part of the collar on 16. They removed the rest of the material and then laid zoysia in its place. We also had some bermuda contamination and very weak turf in front of 18 approach which was pulled up and replaced.
 
                Bent grass sod being reused on collar on 13.

Finishing the removal. All of this work is being done by hand.
Zoysia sod being laid on 13 approach 
The finished area.
Jason Cutting the old material off of 18 approach.
The look from the left side bunker.
Same area but from below the area.
Finshed area looks great. Still some weakness in front which we will work on improving with aeration, compost and traffic control from our mowing units.







Friday, February 22, 2019

Between Now and April 1st We Must All Do Our Part

This has been one winter that has forced many of us to leave for warmer climates or dream of warmer climate if you haven't been able to leave the city. We've not been able to open the course on warmer days because of frozen conditions within our greens. We finally opened today for the first time in many weeks. We could have some additional course closed weather days before we begin to mow a great deal but they should be for much shorter intervals than what was experienced over the last month or so.There are a few things that our golfing members could assist us during the next few weeks until the turf begins to firm up and grow and we are fully staffed in April
Middle of 6 White tee concentrated divot wear. Please use the edges when possible.
  • Greens will be very soft and repairing ball marks would be helpful.
  • Divots on tees and fairways could be large due to the soft, wet conditions. Place your divots back in place, even if it breaks apart. Also, step down your depression which will reduce the exposure of roots to cold and or windy conditions. Your competitors would appreciate it as well in case a ball would roll into your smaller stepped down divot. Of course this is helpful during the growing season as well.
  • Tee markers will be placed back on the tees in a few weeks but in the mean time use areas of the tee that appear more full of grass, especially the sides. Please don't place your ball in the middle of a heavily divot spot to make one more divot. Place your tee in an area of less damage.
  • Carts will probably remain on the paths for the near future and I would encourage that you leave all wheels on the path instead of pulling partially off the path. I know if you are in a group with 2 carts, you have to go around a parked cart. If you do pass, it is always best to go on the side of the path away from the fairway so you do not potentially damage rough in the close rough/fairway area. Certain areas of the course are wetter than other areas, especially bottoms of fairways. It might be wise to wait for the group to move instead of burying your cart in a wet spot at the bottom of #12 cart path.
  • Driving ranges are on mats through at least mid-April or later. Please refrain from hitting off the grass tee. If you must hit off grass, please go to another range until we can get our grass growing and open. I don't like to hit off mats as well but its what we have to do since our grass is not actively growing until late April. The less damage we do to our grass now, the quicker we can open in the spring.
Olympic Flame troubleshooting
There is a great deal of work for our staff to complete before we reach the month of April as well. Not a complete listing but some of the main work.
  • Finish all the equipment repairs for tees, driving ranges etc.
  • Clean up of all equipment and checking carts for the season
  • Continued tree removal and tree trimming.
  • Rake and clean up gum balls and other debris
  • Blowing remaining leaves that have dropped and finishing fence leaf removal.
  • Monitoring seed head production on greens and spraying.
  • Dry-ject(aerate) greens March 18-19 45 tons of sand.
  • Aerate rough and root prune trees
  • Finish applying weed grass post and pre-emergent to fairways. tees. Walk spread pre-emergent around greens and apply by fertilizer hauler pre-emergent into rough areas.
  • Repair greens surrounds with sod and other areas of course with sod and seed.
  • Clean up tree stump grindings/sod
  • Repair driving range netting by installing new telephone pole.
  • Changing holes, moving tees a couple times a week as needed.
  • Repairs to outside areas around the clubhouse including walkway lights, patio lighting, pool clean up and lawn areas.
  • Asphalt repairs as needed.
  • Growing all of the plants for this season and Becky will be busy cleaning up beds and planting spring pots around the clubhouse.
  • Clean up in and around field bar]
  • Rebuilding 2 tee
  • Rebuilding the greens nursery
  • Grass part of dam on #9.
  • Divot filling
Repairing and painting driving range bag stands. These were all home made by the staff a couple of years ago.
As you can see, we all have responsibilities that are important for the overall well being of our grand old golf course. We of course first rely upon you to come out and visit us, first and foremost but while you are here, some player etiquette in regards to the course is always appreciated.

Friday, April 8, 2016

Weather Stats for March, Water Line Repair/Cart Path Repair, Ornamental Bed Rejuvenation and More



The very nice weather stats for March.

MONTHLY RECORDS

9TH WARMEST MARCH ON RECORD

TIED 2ND LEAST NUMBER OF OCCURRENCES OF MINIMUM TEMPERATURE LESS
THAN OR EQUAL TO 32 DEGREES

DAILY RECORDS

3/8...RECORD HIGH MINIMUM TEMPERATURE OF 63 PREVIOUSLY 62 IN 1974

3/15...RECORD HIGH TEMPERATURE OF 82 PREVIOUSLY 81 IN 2012

Temperature
                                    Observed      Normal Value    Departure from Normal  Last Year

High                                 62.5                   55.9                           6.6                            57.2
Low                                  43.6                   36.6                           7.0                            35.6
Average                            53.0                  46.3                            6.7                           46.4

Precipitation

Rainfall                             2.29"                3.32"                        -1.03"                       3.0"

Snowfall                              .3"                  2.3"                          -2.0"                          .6"



The short range grass tee is now open. Long range tee will be another week or so. Short range tee is built on sand which allows it to warm quicker and begin growing and repairing itself a little faster. Long range also sits in a hole and its definitely colder down here but it is looking good.

The staff repaired the water line for the water fountain on #14 yesterday. The leak was directly in the middle of the cart path. They cut the asphalt out and were able to locate the leak about 15" underground and made the repairs pretty quickly.
Tom and Jason down to the dirt.

Leaking metal line on the right side of the picture.

Skip touching up the new asphalt patch.

Russ packing and smoothing the newly laid asphalt.


At the top of hill of #7 about 50 yards from the green  significant bump that developed over the last year or so in the cart path. The boys cut out the asphalt and patched the area to make it smooth again. Also at the main road and 7 cart path, we have had the little path blocked off that goes up the right side of the hole. We are eliminating this cart road because of the wear and tear it creates at the beginning and up the right side of the fairway for at least 50 yards. Excessive cart traffic weakens the zoysia. We used the asphalt saw to cut a small walk path for our walking golfers to continue to use. We will be picking up the asphalt next week and will fill the area with soil and fescue sod next week. We will be placing Ornamental wood stakes with rope along the main road to block cart traffic from entering this area. We are requesting that carts use the left path and then cross the fairway. 

Russ tamping the new repair on hole 7.

Finished

The arrows point to the new path that will be for walkers only. Rope and stakes will be used to direct carts to the left path on #7 near the red tee. Excessive wear at the beginning of the fairway from cart traffic is the reason for the changes.

Becky has designed a new planting scheme for the Bubble Ornamental Bed. The existing bed was a bit overgrown and tired and was in need of some attention. I pulled the plant material out today, we will be tilling the area, adding soil, changing the shape of the bed, adjusting irrigation as needed, till in compost for the new bed and plant it all hopefully within the next week. Some of the perennials she planned are still growing in the greenhouse and will be delayed in their installation until they are mature enough to plant.

Plants removed and now empty.


You will notice some additional sod work was completed by the staff early this week. Areas repaired include the drive off near 8 green just short of the bunker. The left fairway bunker on #5 needed some replacement. There was an area to the ornamental planting as you come down the hill toward the first tee. Trees have been removed in this area but rough mowers and roughed up this spot pretty significantly over the last few years. This area had soil added and new sod. A few other spots were completed as well like the walk off area near 17. We used 480 yards of fescue sod in the last 2 weeks. 

Fairways and all tees were mowed early in the week. Yes it will be cold Friday night but I don't expect the temperatures will be cold enough to stop the green growth in our warm season grass.

Greens continue to heal but these cold temperatures have not done us any favors. I did roll a few balls on the putting green today and our ball roll is improving noticeably since we have been able to mow a couple of times this week. We mowed and rolled today and will roll the greens again in the morning if the frost stays away and greens aren't damp. Warmer temperatures next week with early week rain should continue to move them in the right direction.









Thursday, July 14, 2011

Back of #3 green surround

I had mentioned in an earlier green committee meeting in the spring that I intended to improve the back middle and right hand side of the green surround on #3.  The area is sun filled almost all day long and is incredibly hot in the middle of the afternoon. The intermediate cut is beautiful zoysia which is at 1.25" and is like carpet.  We decided to extend the zoysia back another 16' which places it to the bottom of the back right mound.  We then put another 16' of fescue which will be cut by the green surround mower at 2". Poa annua  overwhelms the area each fall and we decided to remove it for good and replace the area with the sod.  We had hoped to have this work completed sooner so it would be grown in completely for The Invitational but weather conditions would not cooperate this year allowing us to get everything accomplished .  The work was started early Wednesday morning and was completed and in place when the gully washing rain hit the club late that afternoon to no ill effects on the sod.  This area was one of the worst looking areas of the course from mid- summer until fall.  It will be much improved from both a playability and visual aspect.


Jason cut the sod off with our walking sod cutter.  Skip is using the box blade to push the material into the bucket and it is then placed in our single axle dump truck.

A better view of the area.  #3 green is in the back ground.  I am standing near the blue tee of #12.  

The staff finishing up the fescue being laid.  Jason is hand watering the zoysia that was put down in the morning.  The big roll sod provides for a much quicker application and I believe it  heals in much quicker than normal sod pieces.
I

Saturday, April 25, 2009

Slow bermuda growth and new sod

As we discussed last fall, we are attempting to remove bermuda grass from our main play surfaces including fairways, close rough, tees and green surrounds. Last fall, we began to spray fairways 4, the flat parts of 7/8 and 13. It was our intention to do all the fairways this spring but after evaluating the amount of bermuda on the golf course, it has been decided to go at a slower pace to insure that we have quality playing surfaces no matter what type of grass. We did spray the above mentioned fairways on Thursday but there are no real affects showing at this time. One of the things you can see if you have been out on the course is that the bermuda which was sprayed last fall is severely stunted and or dead. You also can notice that much of the bermuda on the rest of the golf course is severely stunted or damaged from potential winter injury and the colder weather we experienced in April.

We have a couple of different bermuda grasses on our golf course. One is very coarse stemmed and the other is very fine. It appears the finer leaf variety has taken a pretty severe hit from the winter and early spring weather. I've posted a picture of #5 fairway below which demonstrates how the turf is slow and appears to be somewhat dormant at this time. We are aware of this situation. We intend to fertilize our fairways within the next 7-10 days depending upon the weather conditions and soil temperatures. The fertilization will encourage the turf to grow but there must also be increased soil temperatures which triggers increased growth of the warm season grasses. Remember, warm season grasses only are actively growing during the warmer months of May-September when the soil temperatures begin to reach 70 degrees or more. Many have mentioned that the turf is dry but it is just slightly dry on the top of the surface. If you take out a divot or uncover the turf, you will see that the soil is still very full of moisture. As the heat and wind continues, you will see a number of areas begin to dry slightly; cool season tees and some green edges where the turf usually has a tendency to struggle. As I noticed in playing today, #5 cool season tee is beginning to dry slightly and a tee is not as easy to place in the ground as the other tees.














Below is the exit area from 5 fairway to the parking area for 5 green. On Friday, we placed some soil and new sod in this area. This area will be roped off for some time. I encourage our members to stay back from this area to help improve the overall health of this area that comes into play on a regular basis. We will encourage changes in traffic patterns with ropes and signs as needed.














This is the view at the parking area for 5 green and 6 tee box. We placed soil behind the curbing and placed sod on this area. This will give you a nice step up area or step down from the turf area. We have roped off this area and are encouraging our members to walk around the ropes. Once we begin to receive some rain fall or need to water more heavily, the 6" of fill dirt underneath the sod will become very soft. Thanks for your cooperation.














The two pictures below are looking up from the main drive between holes 8 and 10 just before the bridge on the main road. We removed some trees, filled ruts and placed sod over the stumps which were ground in February. It was important to improve this area for our members who might happen to end up in this area, assist our mowing equipment, and improve the overall view of the club as you drive through the grounds to the club. This area will blend in well once the sod has a chance to grow. We will also be seeding this area in the fall to encourage additional improved fescue blends in this area. We will also be encouraging our largest rough mowers to stay out of this area to help improve the health of the turf. We will also be encouraging our staff to improve their work practices underneath trees in an attempt to reduce tree ring damage. There will be times when we ask them to completely eliminate mowing specific areas and will utilizing smaller units, push mowers and or weedeaters in an effort to reduce some of the wear and tear from our large rough mowers.

Even though I am comparing the work from a spring picture to the winter view, you can see the improvements. We also eliminated 4 trees which made it very difficult for mowers to operate in this very tight space.