Showing posts with label Bermuda grass. Show all posts
Showing posts with label Bermuda grass. Show all posts

Wednesday, September 2, 2020

Summer's Almost Over and Fall's Coming and A Major Project Change

 Well, we've survived the meteorological summer(June-August) with a little less than 3 weeks before fall. Overall had a pretty good summer. I would have liked the greens to be a bit firmer but humid(wet) and hot conditions do not make it easy to produce that type of playing surfaces. No doubt they will get firmer and roll out will be great here in September/October.

Weather highlights for July/August

4th wettest July on record 9.07"

22 Days over 90 in July, normal is 12.

16th wettest summer(June-August) of all-time 16.49"

26th warmest summer on record.

So what have we been doing on the course the last month or so.

  • Sliced, knife aerated the fairways

16 blades per hub. 12 hubs, 192 blades going about 2" deep and 3" long
12 hubs, 16 blades on each hub for a total of 192 blades. Aerator is 6' wide. Blades go in about 2" deep and leave a cut about 3" long in the fairway. Normally in previous years the slits would turn a little brown due to less rainfall/drying on the edges but with our fairways being fairly moist when we did this work, they stayed green. 


  • Deep solid tined the approaches and tees

There are 6 tine holders with 3, 1/2" tines and 2,  3/4" tines for a total of 30 holes every 3" as the aerator rolls along. We set the aerator to go about 4-5" in depth. This will assist in root growth and moisture penetration into the tees.

  • Sprayed 2 applications of fairway, intermediate and zoysia green surround bermuda eradication chemical products. Fairways are not crispy, just slightly off color from the spray. The club spent $ 250,000 to put the zoysia down in 1995. We are trying to keep the bermuda grass out of the fairways. 



Other work completed included but not limited to the areas below.
  • Needle tined greens at end of July
  • Trimming fence lines trees, vines etc.
  • Topdressing and brushing greens and tees with sand to improve ball roll out and smoothness
This was some of the major work accomplished over the last month or so. Of course there are many hours spent mowing, spraying and daily routine work that takes place as well.

The month of October we had scheduled a tee renovation project for #4/#12 tee complex. The Glen Echo Historical Foundation had raised money for this project through member donations and the Gala. 

There is a 3' drain pipe that takes the storm water from Glen Echo Park subdivision and sections of the course from #6 to the lake in front of 10 tee. One of our rough mowers ended up rest on top of one of the pipes near the edge of 8 fairway when a cave in occurred. The galvanized pipes running underground are completely compromised, rusted out in the bottom which is creating sink holes in various sections of the pipe. We have completed minor repairs over time but its finally time to repair this situation properly.

The project will be broken up into 4 sections. Three sections average about 100-130 feet and begin and end at large drain chambers where the pipes are encased in concrete. The longest run is from a drain we exposed in the left side of 8 fairway to the cart path in front of 7 tee. We intend to place some additional drainage in 8 fairway and to the right of 8 fairway which stays wet for a long period of time in the spring. We also intend to reshape the bottom of 8 to help direct water into the large basin. 

I'm evaluating a potential timeline and will discuss it in the future. We have not had a Green Committee meeting since this situation occurred so more details will be forthcoming. We intend to wait until at least mid November since we will have a great deal of work on the course to complete over the next couple of months and of course we want to give our members ample opportunity to play the course during the middle of fall.


Sunday, June 21, 2020

Needle tine venting, Fairway Aeration, Bermuda Eradication, Green Surround Renovation, and Fathers



Happy Father's Day. My Dad has been gone for 28 years now. A great deal of life has occurred since he went to be with our Lord. Follow the best I can with the lessons he taught me daily on how to live a full life. Sharing your time and treasure to lift up people was one trait he shared regularly. The last day of his life he spent a day in a small town trying to build a new Kiwanis Club that would share in the giving he believed in so much. Its an honor to be your son!

A busy couple of months on the golf course as we barge head first into summer. Allow me a few moments to summarize our work.

Our new zoysia tee and surround areas are trying to establish themselves and mature. Some a little better than others but we moved into some warm weather conditions that will help push it along. Teeing ground turf will be a little slower to respond because of its concentrated wear from teeing it up but we will continue to encourage its maturity. Will begin some sand topdressing to help smooth out the surfaces and help them fill in.

We sprayed the weed contamination on the surround on 5 and 6 where the turf is established. We also sprayed some bermuda encroachment in these areas as well. Speaking of bermuda eradication, we will begin our fairway applications in the next few days as weather allows. Please see the video below for further explanation.



6 Green surround continues to improve. Weed control applied and we've opened the right side bunkers for play.
Fairways and tees were aerated last. We still have a few tees left including the ranges, the approaches and close green surround zoysia areas. We will do this work as weather and time allows over the next week or two.

We also Vented the greens using a very thin 5/16 needle tine. We also double topdressed the greens over a 5 day period last week.

Why vent the greens? You just aerated them at the end of March twice. Venting is a process that is used because it reduces surface disturbance but improves performance of our root growing area in the plants. 
  1. It improves gas exchange. Oxygen in and carbon dioxide out which can build up over time in the root zone.
  2. Allows water to penetrate in hard to wet areas and can dry wet areas more quickly with air entering the subsurface.
  3. The surface closes rather quickly but the small channels into the green surface going down 4-5" allow for roots to improve and thrive. Research has shown that these small pathways can be effective up to 3 weeks.
  4. The lack of basic infrastructure in our greens(no drainage systems) places puts us at a disadvantage when it comes to dealing with adverse conditions including high heat and heavy moisture. This regular program allows our greens to combat some of the problems we face.
  5. As you will see in the video below, there are 48 venting tines on the machine. Our greens average about 5,000 sq ft. Thats about 145,000 vents into each green assisting approximately 142,000,000 million bent grass and poa plants to survive. Approximately 1,500 plants per sq foot.





We have not been walking mowing our greens but plan on getting that started this week. We have 3 new staff members for the summer who we will begin to train along with our experienced group to incorporate this into our program for the summer to improve green conditioning.

Thanks for your time and I will try to get back to posting some additional work on the blog in the upcoming weeks ahead.



  





Saturday, June 22, 2019

Blues, Stimulation, and Getting Tight


What a whirlwind the last two months have been if you are a sports fan in our fair city. Great run for our St. Louis Blues as Pierre Laclede can attest outside city hall last weekend!!! #LGB

Speaking of stimulation which our Blues did plenty, we have finally been turning to the good side of weather over the last few weeks even though Friday and Saturday have been wash outs for the most part.

Glen Echo is a warm season golf course. Our largest area of fine mowed turf are our fairways and tees which account for almost 30 acres of warm season grass, mostly zoysia. The bermuda grass which I have a love/hate relationship with is required to help round out our course and fill in where we have voids in cool season fescue, poa annua and bent grass which invades our rough. The long cold winter has slowed its emergence in higher traffic areas but warmer temperatures are beginning to help it fill in where we need it.

There were enough gaps in the rain during Stanley Cup winning week so we could apply fertilizer on the fairways/approaches which will improve green up and also begin to help the turf fill in as needed. Most areas where we have needed to replace turf in fairways occurred from some of our bermuda eradication work last fall and some winter kill of both bermuda and a little zoysia. Also we experienced a few thin areas in north to east facing slopes 10 and 12 approach and also from excessive shaded conditions.We still have a few more places to do some sod patching on fairways, intermediate, and a few green approaches and surrounds. As temperatures increase which increases soil temperatures, this will also speed up growth of our warm season grasses. We did modest fertilizer application around the greens to improve fill in of the bermuda and give the cool season turf just a bit of energy to fight through the rest of the summer. We will do some additional spray-able and granular apps along weaker fairways and around all fairways in the first pass of the rough.  This will improve color and thicken the rough for the summer. Oh joy he's going make the rough rougher, yes, yes I am.

I think overall our rough is about in the best shape I can remember since arriving in August of 2008. Still fighting some weeds in various parts but are getting some good kill throughout the property. applications.


We had hoped to begin aerating fairways on Monday but it appears we will be too wet. We will try next Monday on our closed day which allows us to get a full day in. We will also do some individual fairways this upcoming week if we begin to dry down.The fairway aeration program should improve the turf in a number of ways:
  1. Reduce thatch through increased microbial soil activity
  2. Increase water penetration and drying down in wetter areas
  3. Assist with disease management including fairy ring
  4. Stimulate turf growth
  5. Reduce compaction in our fairways soil
  6. Breaking of the cores will help to fill in small imperfections in  surface areas.
Russ mowing 2 fairway.
From behind #2 green

The course continues to tighten and improve as we work our way into the first week of summer. Tree trimming, tree removal, sodding, aeration, and just general clean up of all areas are ongoing 

 I've included a Countdown Timer on the main page of the blog for the upcoming Invitational Member/Guest coming up in July. Amazing to think we are less than 30 days away from this great event.

Wednesday, May 8, 2019

Course Discussion, Bermuda Eradication and More

We've been able to mow more and more turf over the last week but conditions are very wet in various areas. It appears there will be a change in the pattern beginning over the weekend. We can't wait!!!!!!!

Randy and Rollo push mowing the area between 7 tee and 8 approach fairway which is too saturated for a big mower. You can still see the smaller tracking from the 22" mowers.

Bermuda eradication work on the course is ongoing. We attempt to suppress the bermuda in the late summer and early spring. You can see some of the areas that have worked pretty well in the intermediates on various holes. Our goal is the reduce the competitive advantage of the bermuda through early summer. We then do everything we can to repair the damaged bermuda areas and allow the zoysia to take over other areas by mid-June as we prepare for the rest of summer play and of course 'The Invitational' in July. We've made great strides with this work over the years but must continue with maintenance applications to keep the bermuda in reasonable check. Notice I said check and not eliminated. I posted a video below which is a bit longer than normal but goes through the thinking of our program and what we are attempting to accomplish.

https://www.youtube.com/watch?v=26nDb0Mb0Gc


Thursday, October 4, 2018

Collar Renovation

Over the last few weeks, the staff have been chemically treating our collars in an effort to weaken the bermuda grass that has invaded them. We've made 2 applications of a product called Pylex which is safe to use on collar height bermuda. Today, the guys are renovating the collars and planting some bent grass seed around each collar. The overall process will not be completed until next spring. It will take the bent grass plants time to mature and spread. We wll have to also continue our bermuda grass sprays next spring and will have to work our way off the greens to reduce the amount of competition that enters the collars in the future.

The process we used today is illustrated below and in video as well:


  • Used our Toro Walk behind aerator to place small and shallow holes one pass around each collar.
    10 small tines per holder. We are using 3 sets on our machine which is about the width of the collar.

    As you can see, my pinkie still dwarfs the tine. The tine goes into the surface no more than about 1/2" which provides enough room for the seed to drop in and be protected from a mower and adverse weather conditions such as high temperature.

    The remaining process will be illustrated in a couple videos below.
  • We then use our walk behind slit seeder to slice some lines into the collar creating a slight channel for the plants to germinate and mature.


  • We then take a drop spreader with some sand and bent grass seed and drop it onto the collar surface. This is to insure we get seeds into the open spaces and the job saver tine holes.



  • The collars are then hand brushed with a stiff broom and they are mowed without baskets to insure the bent grass remains on the green or collar edge.
































Thursday, September 27, 2018

Update on Fairway Bermuda Eradication Spray

Its pretty obvious the fairways that were sprayed with our bermuda eradication chemicals a few days ago. The bermuda has turned an off color red. There is one fairway, #8 which I noticed a skip in the spray which gives a good example of bermuda under attack and green and in good shape. Video is below.

https://www.youtube.com/watch?v=7EfeQAsAi3w



Monday, September 17, 2018

Bermuda Eradication #5 Fairway

 Video from 5 fairway regarding our herbicide application on holes 4-5, 7-8, 10-13, 15, 17-18. Holes 1-3 were sprayed a few weeks ago at what amounted to a lower rate. Came back with an updated rate on the holes above which will show more damage to the bermuda.

2nd application went down the other day on our collars and we also hit some of the approaches missed by the first spray. Also did some backpacking where the zoysia came up next to the greens, mostly on approaches since the zoysia cannot handle the over spray of this material.

https://www.youtube.com/watch?v=_cat-JTKk90


Thursday, August 30, 2018

Spraying Collars with Bermuda Contamination As Well As Some Fairways

Last week, Tom sprayed the collars that had bermuda contamination in various stages. We still must backpack spray areas that have zoysia next to them because the chemical is harmful to zoysia so we will do it very carefully with our small sprayer where bermuda has contaminated the collars next to zoysia.

This week the bermuda has turned white if you have been out to the course the past few days. The chemical used (Pylex) disturbs the cartenoid biosynthesis. Carotenoids serve two key roles in plants. They absorb light energy for use in photosynthesis, and they protect chlorophyll from photo damage. By turning white, the chemical is disrupting chlorophyll production in the plant. We are applying this product at 1/2 ounce per acre because it is being applied over the top of bentgrass. It can damage the bent so we are going with lower rates to offset injury to the bent. Standard use rates on more tolerant species are only 1 to 1.5 ounces per acre so as you can see a highly effective product at low dose rates. We must do 3 consecutive applications over about 1 1/2 months to kill the bermuda. Of course, you must then go after the bermuda that is outside the collar so it is an on going process.

Collar on 10 turning colors from green to white. Part of the plant is still green. Successive sprays should for the most part kill it.

This is a section a few feet away in the approach that was not sprayed.
I also sprayed 3 fairways with our fairway eradication product last week. You are beginning to see some changes in fairways 1-3 and a little on 18. The bermuda in these areas will turn a little reddish as the chemical works its way into the plant. I'll have pictures of this over the next few days as the chemical begins to do some damage to the bermuda. I need to spray other fairways but rain and high heat have gotten in the way. I'll probably spray them right before Echofest so it does not disrupt the color until after the event is over. We also must get these sprays completed before the zoyia grass goes dormant which could effect its ability coming out of dormancy next spring.

Sunday, August 19, 2018

10 Very Full Years

Just completed my 10th full year at Glen Echo Saturday. My how time flies when you are having fun! The transition back to a full-time Superintendent role will be pretty simple except for the fact that I will be getting up a couple hours earlier. Of course over the last two years, my eyes have usually popped open at first light or the old wake up time but I've forced them back closed again and or turned my head away from the clock to try to go back to sleep.

Skip, Tom and the rest of the staff have had an excellent year on the course. We are already beginning to transition into preparations for next season. We are seeding some of the mowing equipment damage areas which we will continue to do through the next few weeks. We will be doing some quick slit seeding in areas around greens and high traffic areas. As you can see from the repairs around trees, seed is popping nicely right now with some timely rain and cooler temperatures. We will also be doing some additional slit seeding of fescue in the rough over the next month before the normal late summer early fall dry conditions set in. Of course this time of year is exciting for us because firm and quick ball roll out are the signatures to September/October at Glen Echo.

We will be spraying some bermuda grass on fairways and intermediate to get it going south before fall/winter sets in. In my travels around the course the last couple of weeks I'm beginning to see a little more bermuda coming back in the fairways so we want to keep it at bay and encourage the zoysia. We will be doing some slicing of our fairways and will be doing some solid tine work in some of our higher population fairy ring areas to improve water and air penetration. This effort will encourage some thatch reduction which is one cultural practice that could help is minimizing some of the damage from these rings.

We will also be going after some collar bermuda around the greens. We will chemical treat the  bermuda which will turn it white in color. It takes 2-3 applications every 3 weeks to get this stuff under control.(Of course I don't know if you truly ever get it under control) As we do this work, I will make some blog posts explaining what you are seeing as it is happening.

I appreciate what the membership has done for me and my family over the last 10 years. I look forward to assisting the operation anyway I can to provide a quality club experience to our members and guests. Will still see you in the clubhouse for a few more weeks but look forward to seeing you on the course in the future.


Tuesday, July 4, 2017

Bermuda Eradication Part Deux Hundred

First early morning arrival to the course in a while. Don't miss getting up at 4:30 but do miss the course waking up. Shot a little Bermuda Eradication video and yes we will be killing some Bermuda after the Invitational. I have not sprayed this year due to some weakness in the Zoysia.
 Fairways overall continue to improve with some filling in needed on 1,2 and 4. Tees were aerated last week, fairways were spiked which is the reason for the little slices with the brown edges where they dried out. Most of those areas have recovered. Yes and I have the finger ready for the video!


Monday, April 3, 2017

Fairway Bermuda Eradication Version 2017

The Zoysia fairways are greening up early this season. Our fairways at Glen Echo have a tendency to be a bit behind because of our Bermuda Eradication work we are doing with late Summer early Fall herbicide applications. I think most will agree we will take being a little bit behind in trade for the great shape they have been in mid-summer until the end of the season the last few years. First video of the year about our Eradication program describing the area  on the north side of the main road of #8.



Sunday, July 31, 2016

Fairway Bermuda Eradication #10

Video below discusses our ongoing Bermuda eradication work within our fairway and intermediate. I could not be more pleased with the results we are having but we must continue to reduce the Bermudas ability to spread by pounding it with our chemical treatments before fall sets in and it goes dormant. Hopefully mother nature will give us some help this winter and freeze more of it out!

https://youtu.be/5Vu7iDmB3bM



Thursday, July 7, 2016

Bermuda Eradication Update Hole 5

Video updating Bermuda eradication work.  We did lose a few pieces of sod from our earlier replacement and will be removing in next couple of days. Other than that, work is going as good as can be expected. Next spray will be after  MAGA Amateur in early August. Can't stop, won't stop till its gone!

https://youtu.be/y97upt315AE

Friday, June 3, 2016

Well, There He Goes Again, Fairway Bermuda Eradication Time Again!

I know, does'nt have a darn thing to do with Bermuda grass. Lady at Invitational 2013 or 2014
Yes, I am going again President Reagan! Time for the 2nd app to the fairways of our Bermuda eradication program. Sprayed 10 acres today through Hole 10. I will spray the remaining fairways on Monday. I did not apply in some weaker areas and intermediates where the Bermuda is too heavy. As you've seen in other posts and other forms of social media, the staff have been laying a great deal of sod in many places to improve our zoysia coverage. We have  a little more to do but for the most part that will end but we will continue to add some sod where we have some especially thin turf areas from our nursery over the next few weeks.

Some might question why spray again? Our fairways are a little weaker than other places in the district.  We have spent a great deal of time, sweat and money in sodding and treating our fairways with chemicals to reduce this weed's competitive edge. It's important to continue the program or the gains we've made will have been wasted.

I would expect the turf to begin to show its effects from the chemical early in the week and the Bermuda will begin to be effected more severely within the next 10-14 days. In about 2 weeks, the Zoysia should begin to change from a lighter green to its normal
green color. We will also be fertilizing our fairways early next week which will encourage the Bermuda to take in the chemical and help the Zoysia return to normal.

We will discontinue spraying because of our busy July schedule and will commence again after the first week of August and the Metropolitan Amateur Championship.



10th Fairway with indicator foam to mark the passes to insure overlap does not occur.

Tuesday, May 24, 2016

Holes 8 & 17 Fairway Intermediate Sod Work/Bermuda Eradication Program

As the staff was cleaning up the course yesterday from weekend play and prepping for a tournament, eight more pallets of zoysia grass rolled in waiting to be laid today. Praying for no rain as I mowed fairways this morning at 230 a.m(no that's not normal)  clouds hung around but the rain stayed away. Had the crew split between three main jobs, course prep for The Lorette Medart Tourney, tree work on 3 and sod work on 8 approach and then the start of 17. The guys busted their butts today. Placed about 325 yards between 8 and 17. Still have another 75 yards for 8 on Wed. Of course not forgetting about two other hard working people. Becky is in the middle of planting her near mature babies she's nurtured since mid-March. Of course she having to dodge some smart and excited hummingbirds who flirt in and out looking for some great nectar. Dave is hard at work keeping our aged fleet up and running.

The sod removal process involved:

  • Cutting out the old stuff with a sod cutter and hauling it to the dump
  • Hand raking smooth
  • Applying some fert to get the sod started rooting
  • Laying the sod
  • A little drink of water, finished. 
Hard work plus the added pressure from the boss to leave the area before our ladies groups passed through. These areas were sprayed with our Bermuda Eradication spray. In some cases, just a few hairs of Bermuda trying to creep back in. We will continue to spray these after the Zoysia roots to continue to knock it back.

If you missed the earlier video from youtube regarding our plans on #8, its at the bottom of this group of pictures.

Alphonso and Latrell cutting the new sod in place.

Randy and Jeremiah lifting the old stuff in the top near the bunker. Old sodcutter  resting and waiting for its next task.

I captured this from the blog/video I posted regarding our plans a couple weeks ago.

Finished area looking good. 

Russ, Latrell and Jeremiah. Also had Tom, Jason, Parker and Skip who rammed this work through for me.

Looking good start of #17


https://youtu.be/D8eMX2mJT3I





Wednesday, April 27, 2016

Bermuda Eradication Program #10 Intermediate Sod Replacement

The past couple of days, the staff have worked on replacing the intermediate along #10 Fairway. We are replacing a little more than 1/2 of it due to Bermuda contamination. We have some spots along the right side that we cut the old sod off but did not have time to remove the old sod and place the new sod. We should have this area completed by next week since conditions are wet and we have an outing for more than 1/2 the day on Friday.

We will circle these areas as ground under repair. We will also circle the new areas and ask that you take a drop from these areas. We have a number of other areas on fairways and intermediate on a number of other holes on the course over the next few weeks as conditions and work schedules allow. #10 will take about 800 yards of sod. A box blade on a tractor and the loader would be more efficient and would help quicken the pace of work but would also create excessive damage because of the weight.

We sprayed these areas with not only our Bermuda Eradication spray but also Round Up last fall in an effort to knock the Bermuda down a bit more. A cold winter would have helped us even more but to no avail.

Most of the area can be driven across with carts without any issue. We used mostly big roll sod which can stand up to more wear and tear. We have a little softer conditions at the circle around the start of the fairway. We will rope off this area and place cut thru areas for walkers. Please follow any signs or ropes to assist us with growing the turf.

Jason using the sod cutter and cutting out the old material. Our intermediates are cut with an 84" mower. The tractor in the background was used to roll out the sod.Sorry no pictures of that operation. Just got too busy and failed to get enough pics.

Randy, Latrell and Alphonso physically removing the cut sod.

The arrows point to the intermdediate that was replaced. We still have to replacement to do up the right side.

The green line shows that we started where the cart path ends on the right side of the fairway after it comes across the lake spillway and went all the way around to the bridge less than 100 yards from 10 green.

Saturday, April 16, 2016

Fairways Sprayed(Bermuda Eradication Program)

I made the first spray of the spring season to our fairways as a part of our Bermuda Eradication Program. I would expect at least one more spray in the next 30 days or so and than a little break in the program allowing the sodded areas and some pretty significant golf events to get completed and we will then spray probably 2-3 more apps in late summer/early fall.

I would expect the Zoysia to turn slightly off color for about 10-14 days. My hope is that we've timed it properly to knock down some Bermuda significantly but to also reduce the amount of seed heads we will have from our Zoysia. If we are able to reduce the seed heads this will allow the zoysia to save energy that it would have used in producing seed. Lets keep our fingers crossed. I posted a video below regarding this program. Miss you girl.

https://youtu.be/ml3O_4MHnP0

Saturday, April 2, 2016

2015 to 2016 Fairway Bermuda Eradication #12

Another example of our Fairway Bermuda Eradication work on #12. View below is from Spring 2015 where we had sprayed the Bermuda the fall before with our product. The last photo shows how well the Zoysia has filled in and how the Bermuda has been slowed allowing these improvements. We will still need to spray these areas further to help suppress the Bermuda even more but the program is working well in many areas on the golf course.

This was last spring looking up the hill toward 12 green. Fall 2014 spray hit the Bermuda pretty hard in this area.


Some replacement last season in the larger areas.
Very little Bermuda coming out right now. A great deal of the right side intermediate is Bermuda that is slowly coming out but very little if any in the main part of the fairway. This chemical applications are working very well for us. We will have to continue to do some wholesale replacements in the intermediate rough because some areas are completely void of  Zoysia.

Saturday, March 26, 2016

Fairway Bermuda Eradication Progress

Edited 3/26

I was doing some research on the blog site the other day and ran across the April 2014 video showing some damage or weak areas in 1 Fairway where Bermuda was sprayed the fall before.

I did the same thing last fall on this same Fairway but you see hardly any Bermuda damaged from last falls spray because the Zoysia has improved significantly in these areas. That does not mean the Bermuda is completely gone, it probably isn't but it does mean that the  Zoysia is more active and out competing the Bermuda in this area. The first video is the current view and the second video is from 2014. I thought you would enjoy seeing the progress, I sure do!

Shortened Version
http://geccgcm.blogspot.com/2016/03/shortened-and-updated-video-of-bermuda.html

Longer Videos from original post.

MARCH 2016 VIDEO

https://youtu.be/4kowErpDMEI



APRIL 2014 VIDEO

https://youtu.be/BwOvmej_tBU

Wednesday, September 30, 2015

Drill Seeding Rough

We've been attacking the first cut or two of  Bermuda in our rough with herbicides to reduce its competitiveness over the last month or so. With this reduction means we will need to start some new seedlings of Fescue in areas where we have less than adequate cool season turf, thus its time to start drill seeding our rough. We will be drilling in high traffic rough areas around greens and fairways in an effort to get a stand of grass before winter sets in. It is difficult for young seedlings to make it in our environment with a great deal of shade, mowing/blowing equipment and cart traffic. Hopefully we will get the turf up and growing before the main onslaught of leaves start to fall. By then it will have been fertilized and we should be in good shape for next season. We hope to get this grass up and growing in 10 days or so and look forward to it competing with the Bermuda that survives the winter and from the various chemical treatments it has received. Video below explains our process.

https://youtu.be/ezwBXSy7lwM