Showing posts with label cart paths. Show all posts
Showing posts with label cart paths. Show all posts

Tuesday, August 31, 2021

Part Deux, Puffy, and Overlayed



 As meteorological summer began in June, we thought we were in for a hot and dry summer. The end of June and into July brought copious amounts of rain.(As wise men once said it never rains in July). Along with the rain storms came tremendous damage to THEM things which created some issues for our staff but they stepped up and handled the situation as best could be expected.(As seen on Social Media I will not use the word Trees as I now refer to them as THEM. Its a coping mechanism so work with me here)

Well, Part Deux happened again last week but luckily to a smaller extent.We struggled a bit through some horrific weather last week but have made it through to the other end. We hope to have the rest of our mess cleaned up for the holiday weekend including getting some support posts put back up on the tennis courts to stop any further damage. The new wind screens are being removed for the season to reduce any further damage to the existing structure until we get it shored up and strengthened for next year.

 1 green after tree fell on irrigation system causing 2 heads to come on. I came back to turn off irrigation not knowing this had occurred. Happy I came back.

 Over the last few weeks, our greens have struggled from soft and puffy conditions. Temperatures have averaged more than 3 degrees above normal including that all important night lows which has not allowed recovery time of our turf. Consistent and regular rainfall on our greens which do not have drainage has led to soft surfaces and fat/lazy grass plants who do not like to give up additional ball roll out. We have been forced to not mow greens on a number of days because of the rain or damage which has occurred on the course. We have also had issues with scalping out in the middle of greens and over the top of our hole locations. We use a plate that we stand on which reduces the heaving of the greens as we pull out the 8" plug from the green but we continue to have issues. Also, with an inch or two of soil at the bottom of our hole this creates great suction when the greens are wet. We attempt to reduce this suction using various techniques but sometimes to no avail.

                              This has been experienced many times this summer at Glen Echo
 

 Heat and moisture leads to high microbial activity in our sub surface's and the release of additional nutrients for plants. We attempt to control this growth by the use of regulators but that has been very difficult for us to accomplish over the last few weeks. High heat shortens the window of the chemical's useful life and then chaos hits the course either in 1-2" rainfall and or high wind conditions and we've missed some of our windows for spraying. One of the chemicals is a product which has to dry on the greens and the other must be watered in which also creates its own set of issues. When you are already wet do you add more moisture and possibly make your greens sick just to control growth. Sometimes you just have to do nothing until the environmental conditions change. We anticipate with cooler weather the next 7 days to get back on track with sand topdressing, brushing mowing and rolling. 

We are looking forward to more of this!

  We had hoped to have some cart paths back filled with soil and sod added in the worst areas between 1 tee and 4 but have not been able to accomplish this to date. We hope to begin this process as time allows. To a man and women, we are much appreciate of the effort to clean up our cart paths. You can do all you can to have great turf but having your equipment banged around with heights of cut set at thousandths of an inch can lead to issues on our best surfaces. I see staff members driving down the middle of a fairway to avoid the rough nature of our paths. Some have mentioned, why not concrete? Well, if we had a choice of course we would go with concrete but the cost is astronomical in comparison. Our local superintendent has a text thread where we throw out questions or look for guidance. Been told by a reliable source that has been doing concrete over the years that replacement of asphalt and going to concrete would be easily into 7 figures. I would like to have the most modern bent grass on our greens and complete drainage in each green but it can't happen right now. 

                                                                 The old and the updated!

From November through March, we have a tendency to have some large equipment on our paths.Our dump truck is 7'10" wide. An 8' cart path leaves you no room for error. An 8'4" cart path basically the same but does give you just a little wiggle room. Our backhoe is over 7' wide and our lift is nearly 8' wide and heavy. We work in the winter during freeze and thaw conditions which is the norm around St. Louis since we don't stay nearly as cold. As we are driving on our existing roadways you literally see them flex up and down.creating more path repair work the next season. Kind of makes you sick to your stomach knowing to accomplish your work you have to tear up something and create more work. Over laying these paths will help to strengthen our existing surfaces and allow us the time to continue to improve our facilities to the best we can make them.


We of course focus our efforts on our daily work but our biggest event of the season if coming up rather quickly. The Invitational 2021 opening round is about 403 hours away. I anticipate you will see some ever changing conditions over the next 16 odd days. I hope you have pleasant day.

 

Thursday, March 18, 2021

Drain/Cover, Restrict/Educate and Pound Sand

 Well, it appears we are coming out of winter in pretty good condition generally speaking. All of our turf has not awakened but I am seeing a tinge of green in some of our zoysia areas. We still have to see if some high traffiked areas are damaged from foot and or carts. More on traffic later.  

DRAIN/COVER

The drain and cover part our blog would not have occurred without some dry weather at the first of the month. This allowed us to make great progress on the drainage project from 6 cart path all the way down to 8 cart path. We finished installing of our small drain lines and covered as much as we could in sod. Over 1,800 yards of zoysia and fescue were laid in various areas. The front of 6 green approach and 8 fairway were covered in zoysia. The left rough on 8 and a few strips along the drain line in front of 7 tee were covered. The remaining areas still need some additional soil and a little bit of settling time.


Laying zoysia sod in front of 6 approach. 30 yard rolls.

After adding some additional soil to the left of 6 green Skip is smoothing it out. Still need to add more dirt to the area and more grading once the rain has stopped.

Some finish soil to help smooth out 8 fairway drainage site.

Skip grading on 8 fairway.

We used the forks on the box to break up the soil surface. We then graded with the box blade finished graded with our bunker rake. Our sod producer who was one of the owners of the company complimented us on our finish grade work. Sorry, for some reason didnt take a finish grade picture.

Big roll sodding 8 fairway.

Almost complete, had to bring in more zoysia the next day with the fescue.

Looking from the green side of 8 across the zoysia.

Big roll fescue going in on the left rough.

From 8 cart path looking across toward 7. Just waiting on some drier and warmer weather weather to get this area opened. It will need to firm considerably before we open it for play.
Signage and ropes asking you to avoid these wet areas at the bottom of 3 green.

Looking across 8 near the intersection of 7 tee cart path. With exposed soil above the newly sodded area, we decided to put some hay bales across to catch the soil from washing down on the new sod until we can get it covered with grass. Bottom right foreground are a few stips of fescue we had left over from 8 rough that we laid on solid ground that was not disturbed except from construction traffic ..

RESTRICT/EDUCATE

With the warm weather comes an increase in cart traffic. With increased cart traffic comes the need to restict cart traffic to slow the potential damage to emerging turf which is slow to awaken from its winter slumber. I made some soical media posts regarding cart traffic and the damage that can be caused from excessive wear. I thought it would be important to include it as a part of the blog post for those of you who do not follow our social media accounts.

We have various areas of the course which have springs coming out of them until the summer. There is of course just regular water weeping for short periods of time after heavy periods of rain from slopes into lower lying areas like illustrated below on 3. We have cart signs and ropes in areas on #3, #12 and #13 at this time. There could be other areas that develop over time that we will monitor and might have to place additional restrictions.


3 Fairway directing carts around wet areas next to hill side.

We have a number of holes that have permanenent stakes and decorative rope to force traffic to stay on the path until arriving past the starting points of the fairway. In most cases, carts should be driven on the path and then turn 90 degree into the fairway. Going directly from the teeing ground straight through the rough into the fairway creates signicant wear and tear at the beginning of the rough and fairway. 

Many are using these areas like they are interstate on ramps. 

We understand if you hit a shot that is short of the fairway. Its okay to take your cart to the ball and then move to the fairway. Golfers in carts are kind of like cattle and or dogs, They walk or drive the same trail, walk along the fence the same place without thinking of the damage that is occuring. Excess wear and tear costs money and time in renovation and makes the course not look its best. 

This is a pirme area of concern off of 3 cart path. The path comes straight down the hill and turns to go alongside of the fairway. The area at the bottom of the hill has a tendency to be a little wetter than other areas as well. You should not drive straight through to the fairway. 
No means NO CARTS proceed through this area. Carts should remain on the path and then turn left somewhere past the drain area to go across to your ball laying in the fairway. If its over in the left tree line, you can still cross the fairway at a 90 degree angle from the cart path.
Area at the start of eight fairway is roped off to reduce wear and tear. We have also roped off areas on  four, five and seven. As you might not be aware, this takes time away from 
the mowing team as they are mowing the rough. You have to get off your mower, take the stakes down, mow through and then get back off the mower and put them back in place. At times, a manager will be doing other things and will stop in and help remove the stakes but it takes time. I like the natural look of a course and don't like to have to put up stakes and signs but this is something we are forced to do if we want these areas to look good.

Please assist us this season in reducing cart traffic issues by following a 90 degree rule as often as possible.

POUND SAND

No, were are not saying get lost. We are pounding sand into our greens to improve the overall growth of our greens both above and below surface. Our contractor arrived on Tuesday and used three machines to do this work. Cloudy and wet conditions slowed our process but we were able to complete all nineteen greens by the end of the day. 

Dry sand is injected into the surface of the greens with a bead of water with a force of 2-3000 psi. The work is completed on 3"x3" centers. It takes about 10-15 gallons of sand for each pass on the green. Our staff had to move about 40 tons of sand in 5 gallon buckets at a time to fill the sand hoppers on the units. We normally brush and roll the greens but we had to wait until Wednesday to complete this operation. There area a number of benefits in doing this process;
  • Opens the surface of the greens to improve infiltration of moisture into drier areas and allows wetter areas to dry more quickly
  • Allows sand to be injected into the green mixing with the thatch and assisting in its control
  • Provides new pathways for roots to grow and branch/spread
  • The sand expands out wider than a normal 1/2" aeration hole as it reaches the 4-5" range of depth
  • There is not a lot of excess sand on the surface which is a positive of the process. The remaining sand is brushed into the canapy which improves protection of the crowns of plants and also helps to smooth the greens surface.
Below is an illustration from the Dryject website on how it works. Further down the page is a quick video of the process. We also intend to deep tine our greens to about 8" if the rain ever stops. We might be forced to do this over a number of days and do it when we are open. We will do everything we can to not inhibit play  I wll keep you informed as time goes by when this process will begin. This double aearation process is necessary to help improve the drainage in our greens.
























Friday, April 8, 2016

Weather Stats for March, Water Line Repair/Cart Path Repair, Ornamental Bed Rejuvenation and More



The very nice weather stats for March.

MONTHLY RECORDS

9TH WARMEST MARCH ON RECORD

TIED 2ND LEAST NUMBER OF OCCURRENCES OF MINIMUM TEMPERATURE LESS
THAN OR EQUAL TO 32 DEGREES

DAILY RECORDS

3/8...RECORD HIGH MINIMUM TEMPERATURE OF 63 PREVIOUSLY 62 IN 1974

3/15...RECORD HIGH TEMPERATURE OF 82 PREVIOUSLY 81 IN 2012

Temperature
                                    Observed      Normal Value    Departure from Normal  Last Year

High                                 62.5                   55.9                           6.6                            57.2
Low                                  43.6                   36.6                           7.0                            35.6
Average                            53.0                  46.3                            6.7                           46.4

Precipitation

Rainfall                             2.29"                3.32"                        -1.03"                       3.0"

Snowfall                              .3"                  2.3"                          -2.0"                          .6"



The short range grass tee is now open. Long range tee will be another week or so. Short range tee is built on sand which allows it to warm quicker and begin growing and repairing itself a little faster. Long range also sits in a hole and its definitely colder down here but it is looking good.

The staff repaired the water line for the water fountain on #14 yesterday. The leak was directly in the middle of the cart path. They cut the asphalt out and were able to locate the leak about 15" underground and made the repairs pretty quickly.
Tom and Jason down to the dirt.

Leaking metal line on the right side of the picture.

Skip touching up the new asphalt patch.

Russ packing and smoothing the newly laid asphalt.


At the top of hill of #7 about 50 yards from the green  significant bump that developed over the last year or so in the cart path. The boys cut out the asphalt and patched the area to make it smooth again. Also at the main road and 7 cart path, we have had the little path blocked off that goes up the right side of the hole. We are eliminating this cart road because of the wear and tear it creates at the beginning and up the right side of the fairway for at least 50 yards. Excessive cart traffic weakens the zoysia. We used the asphalt saw to cut a small walk path for our walking golfers to continue to use. We will be picking up the asphalt next week and will fill the area with soil and fescue sod next week. We will be placing Ornamental wood stakes with rope along the main road to block cart traffic from entering this area. We are requesting that carts use the left path and then cross the fairway. 

Russ tamping the new repair on hole 7.

Finished

The arrows point to the new path that will be for walkers only. Rope and stakes will be used to direct carts to the left path on #7 near the red tee. Excessive wear at the beginning of the fairway from cart traffic is the reason for the changes.

Becky has designed a new planting scheme for the Bubble Ornamental Bed. The existing bed was a bit overgrown and tired and was in need of some attention. I pulled the plant material out today, we will be tilling the area, adding soil, changing the shape of the bed, adjusting irrigation as needed, till in compost for the new bed and plant it all hopefully within the next week. Some of the perennials she planned are still growing in the greenhouse and will be delayed in their installation until they are mature enough to plant.

Plants removed and now empty.


You will notice some additional sod work was completed by the staff early this week. Areas repaired include the drive off near 8 green just short of the bunker. The left fairway bunker on #5 needed some replacement. There was an area to the ornamental planting as you come down the hill toward the first tee. Trees have been removed in this area but rough mowers and roughed up this spot pretty significantly over the last few years. This area had soil added and new sod. A few other spots were completed as well like the walk off area near 17. We used 480 yards of fescue sod in the last 2 weeks. 

Fairways and all tees were mowed early in the week. Yes it will be cold Friday night but I don't expect the temperatures will be cold enough to stop the green growth in our warm season grass.

Greens continue to heal but these cold temperatures have not done us any favors. I did roll a few balls on the putting green today and our ball roll is improving noticeably since we have been able to mow a couple of times this week. We mowed and rolled today and will roll the greens again in the morning if the frost stays away and greens aren't damp. Warmer temperatures next week with early week rain should continue to move them in the right direction.









Friday, August 28, 2015

Cart Entrance to 7 Fairway, Bermuda Spray in Rough and , Caution! Construction Trucks On Property

Video below discusses the reasons for the rope across the right path along #7. Path is going to be removed this fall. It will be kept large enough for walkers but that is all.  All carts should use the left path in front of the red tee to enter along the fairway of Hole 7.

https://youtu.be/olrxkPQV6Xc





Our Bermuda eradication spray is beginning to show up in some of our rough. See the picture below.


The arrow on the left side is pointing away from the right of 12 green. This area was sprayed with a lighter rate of Pylex onto the collar and the first cut. You can see the darker green color.  The two arrows on the right shows the effects at full rate on the Bermuda after only 2 days. You will see this in a few  areas around greens and in some of our main rough. The left side of #11, around 13, 7, 10, 17 and 18.  Along fairways 1-4, 10, 16-18.


Mark Matteson who works for Clayco has located  some dirt for us to fill in the old tennis court area and for some other uses on the course. There will be some construction trucks delivering soil to the back parking lot and the long range. I expect this will begin next week but have not actually spoken with the hauler. We will also be using our dump truck to move the soil to the tennis courts during this time. I just wanted to warn you regarding these large trucks entering and exiting the property.







Friday, August 1, 2014

Long Range Update

An update on the long range tee work.  While we had the trencher here, trenched a couple of additional areas that needed work.


We extended the drain line out of #1 bunker down to the fence line.  
We put a smiley face drain above the new asphalt on #4 to reduce the amount of moisture that builds up in that area during wet times of the year.  Should also keep the asphalt in better shape.  

The pop up drain along the start of 12 fairway was a continuous mess.
Underground you go and a larger surface drain basin to catch some runoff water.

Becky planted the  new ornamental screening bed next to 13 blue tee and will be mulching it today.

Tuesday, July 22, 2014

Asphalt work completed

Fontana Paving was out yesterday to patch a couple of small areas on the course. Next to 3 green and at the bottom of 4 near the red tee.  106 feet of asphalt was pulled up, rock placed down and 3" of asphalt laid. We have these areas roped off for a couple of extra days.  The areas are roped off to keep cart and equipment traffic away from these spots.  Remaining funds from the bunker project paid for this work. The area on 3 was damaged during construction of the bunkers.  We still must do some dirt work and grade changes around these two areas.

Asphalt removed and rock being laid in place near 3 green.

Asphalt  being finished up before rolling.

Finished

#4 Finished

Wednesday, October 30, 2013

Driving Range Grass Tees Closing/Carts on Paths Coming Soon

We have closed the long range grass tee for the season.  The mats will be open for your use.  The short range grass will be closed after November 3rd.  It is my understanding that 4 new winter range mats will arriving soon.  The grass tees are closed because the turf is not actively growing and cannot repair itself.  We have overseeded 1/2 of the long range bermuda tee for early spring use next season.  The zoysia/bermuda part of the tees will be reopened  next spring when growth begins and we begin to mow the tees.

Every fall, we face the decision when to permanently place cart on paths for the winter(dormant) time of the year.  Carts on paths in the winter protects the turf from wear and tear when it is not actively growing.  This wear and tear can contribute to late break in dormancy.  Severe compaction can lead to weakened and or dead turf.  Carts also driving on fairways in the winter can flatten the dormant turf making for less than desirable playing surfaces in the winter season.

I plan to place carts on paths beginning November 12th.  If we have dry conditions, I will try to have carts off paths for our last event of the season for the Turkey Day Tournament to encourage a large group of players for one last fling on the fairways.  Red flags will be allowed during the winter season if conditions are dry enough to safely allow the cart to be used.  I would expect carts to be back on the fairways once the turf breaks dormancy and we begin to get growth which requires mowing next spring

.

Wednesday, July 31, 2013

Walk paths for Walking only

We have walk paths that lead from most tees to the fairways.  In some cases, these paths seem like a convenient path for carts to drive to the fairway as well.  Signs have now been placed at these paths directing carts around the walk paths to reduce wear and tear.  Please check out the short video below regarding this issue.

Tuesday, April 30, 2013

Carts off paths/Long range open Wednesday May 1st

Come out and enjoy a nice warm weather day with carts off paths for at least a day. Nice warm breeze today help to dry things out.  Started mowing fairways late this evening before dark.  Mowers will be out in force trying to get the course trimmed up before the next round of rain enters the picture sadly for the rest of the week.  Let's hope the forecast is wrong!

We will also be opening the long range grass tee for the day.  Turf still needs to grow some but good enough to hit off of for one day or two days.

Wednesday, April 14, 2010

Asphalt repair on #18 cart path completed

The staff completed the cart path repair along #18 this morning.  A little more backhoes work yesterday to remove the disrupted surface and the roots that were pushing up the asphalt.
Asst. Skip and Russ putting the final touches on the cart path repair work on #18.


The damaged section of cart path caused by the tree roots from the tree being planted too close to the cart path.  
The path after it was repaired back to normal

Monday, April 12, 2010

Cart path repair #18 150 yards out

There was a silver maple growing next to the cart path on hole #18 that was allowed to grow too close to the path. Not only was the tree a hazard for carts passing by but it was raising up the cart path creating an issue for carts and equipment to pass safely.  It was getting to the point where golf carts and our riding greens equipment were having to go around the spot and driving out onto the turf.   The tree was removed and we are in the process of removing the asphalt and placing a new patch over that section of cart path.  We cut the asphalt today and some of the roots which interrupted the surface of the asphalt.  The remaining work will be completed tomorrow morning.

Russ cutting through the asphalt with a saw.  A dirty job.














I'll post updated pictures of the completed asphalt patching and drainage work on #12 once the work is finished by the staff.