Wednesday, November 14, 2012

Day 35 Bunker Restoration Project

We received well over 1" of rain Sunday evening which was needed.  Some of our sod was getting pretty dry from the winds of the last few days.  We were able to do some outflow trenching to finish the right bunker of #5, #17 bunkers had the outflow trenched as was #1.  Today, the staff  will put in a full day on the bunker project.  The outflow pipe was laid and back filled on the right bunker of #5, sod work was finished around the back right of the right side #5 bunker, and some sod was added to the left bunker of #6.  Drainage was placed in the front bunker of #17.  We plan to spread the sand in the front bunker on Thursday and hopefully get it sodded.  I would expect that we will complete the left side bunker of #17 on Friday.

Sodding the back right of #5.

Staff adding a surface drain behind #5 as well as digging the dirt out of the trench so pipe can be laid.

Staff back filling the outflow pipe of #5 which had settled from the weekend rain.

Staff back filling the pipe behind #5 green.

Front bunker of #17 getting drainage placed in it today.

No comments: