We core aerated the long range tee, applied some heavy sand topdressing, removed the cores, brushed and mowed the tee. We also solid tined all of our tees on Monday/Tuesday to a depth of 5" with a 10% kick put in our Verti-drain 7316 which helps to fracture the soil allowing for improved rooting and moisture movement through the turf profile. We also applied a heavy topdressing of sand on the tees to smooth the tee surfaces, improve tees entering the ground, improve water movement through the surface and provide a rooting medium in the aeration holes. Below is a video of the long range tee work.
No comments:
Post a Comment