We expect to finish grade completed on the tee and sod placed in early April and plan to open the tee sometime in May.
There are a number of improvements that this new teeing area will provide:
- Overall tee alignment will be pointed to the up hill side of the fairway and not down the right side of the rough.
- The surface will be all zoysia which requires very few chemical inputs to grow. It will require a bit more light. The first Pin Oak has thinned considerably and will need to be removed in the next year or two once it has passed on to help give this tee enough light for proper growth.
- The overall tee will be reduced in total size.
- The tee will be raised above grade so that water will go around the tee and not flood the tee as it does now after heavier rain fall.
- We will be able to get a few more yards distance out of the back tee for championship play as needed.
Sod cutter was used to strip off the turf. |
Skip then used tractor to pull sod to the center of the tee for removal. |
Piled up in the center and used the loader to move into the dump truck to remove from the site. |
The actual view from the temporary tee. |