Monday, October 22, 2012

Day 22 Bunker Restoration, 'Rain Drops(and lightning bolts) Keep Falling On My Head'

  

  This will not be a long report.  Having a little trouble typing because of a wrist sprain.  No it did no happen climbing out of one of the new bunkers!  We only had .04 hundredths of an inch but just enough to make our work area turn into a pig pen.  We have # 13 bunkers two thirds complete.  We should complete them in the morning and then move onto 5 if it is dry enough.  Skip took some guys to 5 and finished our irrigation install and outflow drainage for the left approach bunker as well..

We will tear out #1 in the morning as well as #12 if time permits.

Kye was working on the right bunker of 17 and will complete it in the morning.  He will then move to #1.

 #9 bunker bank push mowing.  The hole is open for play, bunkers too!

Staff sodding the left side bunker  #13.

#13 left bunker near completion.

#13 right rear bunker drainage being installed.   We did wait because of the threat of a thunder storm.   

Sodding of the right side bunkers.

Right front bunker sodding and sand being added.

End of  the day on #13.

#17 Kye shaping the right bunker.

View of the 17th green with Kye shaping in the background.

Another view of the right front bunker #17.

No comments: