We will be aerating our fairways beginning Monday morning weather permitting. It usually takes us three days to get everything completed. We do a majority of the work on Monday and then do a couple of fairways each day on Tuesday/Wednesday depending upon what is left. We will be using two aerators on Monday. The actual aeration goes fairly quickly but it is the clean up the takes the most time. We will be using our flail unit to break up the cores and then drag behind it. The fairways are blow off and then mowed. The aeration can take around an hour depending upon the size of the fairway and the clean up process can take 1.5 to 2 hours to complete. The biggest issue we have is dealing with dew that slows down the drying process and usually delays the beginning of our clean up until about 9-10 a.m.
We will also be aerating the zoysia surrounds with our rough aerator and will need to do the red tees and range tees with our verti-drain machine. Not sure if mother nature will let all this work happen but we will try.
We appreciate your patience during this most important process.
Maintenance & renovation practices of one of the oldest 18 hole country clubs west of the Mississippi Host of 1904 Gold Medal Matches in the Olympics
Showing posts with label equipment maintenance. Show all posts
Showing posts with label equipment maintenance. Show all posts
Friday, July 19, 2013
Friday, May 3, 2013
Rain day, still a work day
While the seasonal staff were called off for the day, the full time staff still have work to do cleaning equipment, sharpening blades and etc. Still in the process of hiring a mechanic so we are catching up on preventative maintenance issues.
Nick steam cleaning his rough unit.
Nick steam cleaning his rough unit.
Sunday, March 17, 2013
Golf Cart Repairs
The staff spent part of Thursday morning removing 48 dead batteries from various golf carts that we had tested about a month ago. The new batteries were placed in 12 carts. Other batteries that we still good in some carts were moved around to insure that all carts are now operational. We have 240 batteries in our carts. The carts were new in March of 08 so we've completed our 5th year and heading into the 6th. We will test the remaining older batteries as various times during the season and will change them out as needed to reduce potential breakdowns on the course. As the chargers for the carts continue to age, we will be monitoring them as well. Carts that do not receive proper charging will breakdown as well. The staff from Battery Outfitters who is a Master Distributor for Trojan Battery helped us with delivery of the new batteries and removal of the old batteries for recycling. The staff cleaned the older terminals, replaced bad cables as needed and placed a little bit of petroleum jelly at each connection to help reduce corrosion. Batteries for our carts is a significant preventative maintenance expense but it will allow us to get longer life out of our carts over the next few years before we trade them in for a new fleet in the next 3-4 years or so. Barrett and the pro shop staff has been cleaning carts from their winter storage and should have them in good shape for when the weather breaks this golf season.
Friday, March 8, 2013
Course supplies refurbished and on the course
Part of our winter work involves painting, staining, coating and repairing our equipment that goes out on the golf course to assist you with playing your round of golf. With the arrival of March, time to get this spruced up equipment back out on the the course.
Monday, February 7, 2011
Mechanical repair area back in service
Its taken a few weeks to put the repair area back into service after tearing everything completely out, painting the floor, replacing old wood shelving, organizing the parts and supplies inventory and getting everything brought back into the area. Shop is better organized and supplies are in more convenient locations. Grinder will come alive for the next few weeks.
Wednesday, December 22, 2010
Equipment maintenance shop improvement
Former Superintendent Scott was instrumental in changing the overall appearance of the maintenance facility in 2006 with a general clean up of the complete facility. The complete replacement of an aged fleet of
equipment and a general cleaning has provided us with a better looking and organized maintenance facility.
After a few years of accumulating stuff(junk) in the main mechanical repair area plus a floor that is soiled with many years of grease and oil, its time for an overhaul in the most important area of our facility. The repair and parts area is not large by facility standards, 22'x40'. Our parts and supplies are stocked in a separate parts room but along the walls in wooden pigeon holed shelving. This reduces the space in our maintenance area that is already limited and makes it difficult to determine the supplies that we have on hand.
We plan to remove everything from the shop, all benches, desks and storage bins, clean and repaint the walls, acid wash the floor, patch the cracks and holes in the concrete and epoxy paint the floor a light gray which will sharpen and enhance this most important work area. The epoxy paint will be light reflective and will be much easier to keep clean. Shelving to hold parts and supplies will be streamlined and improved. I will post additional pictures of the improvements as we move forward.
equipment and a general cleaning has provided us with a better looking and organized maintenance facility.
After a few years of accumulating stuff(junk) in the main mechanical repair area plus a floor that is soiled with many years of grease and oil, its time for an overhaul in the most important area of our facility. The repair and parts area is not large by facility standards, 22'x40'. Our parts and supplies are stocked in a separate parts room but along the walls in wooden pigeon holed shelving. This reduces the space in our maintenance area that is already limited and makes it difficult to determine the supplies that we have on hand.
We plan to remove everything from the shop, all benches, desks and storage bins, clean and repaint the walls, acid wash the floor, patch the cracks and holes in the concrete and epoxy paint the floor a light gray which will sharpen and enhance this most important work area. The epoxy paint will be light reflective and will be much easier to keep clean. Shelving to hold parts and supplies will be streamlined and improved. I will post additional pictures of the improvements as we move forward.
![]() |
| This is the view from the other side looking toward the reel grinder in the back ground and to the right is the bedknife grinder. |
Thursday, February 4, 2010
Equipment Maintenance
Our mechanic, Harry White working on one of our riding greens mower units. Harry is rebuilding one of the three reels for the unit. These units are used in the early and late season and during our sanding operations during the season. The reel is sharpened on a regular basis which wears down the reel to the point where it will not make contact with the grass. He will rebuild one unit now and have it ready for the beginning of the season. Harry plans to rebuild the second unit after our deep core aeration is completed in March. The mowing operation after aeration will trash the 2nd set of old reels which will then be replaced.
Harry does a fine job in maintaining our equipment and also operates equipment during some of the busier times of the year like aerating greens, fairways and during the extra mowing required during "The Invitational".
Harry putting reel back together.

Harry does a fine job in maintaining our equipment and also operates equipment during some of the busier times of the year like aerating greens, fairways and during the extra mowing required during "The Invitational".
Harry putting reel back together.

Subscribe to:
Posts (Atom)




