Tuesday, October 4, 2011

Day 2, #14 Bunker restoration project

Another day complete in our bunker project work.  Kye Goalby finished his work on the back bunker by around noon today.  The staff picked up the soil from the trenching on the left bunker, placed the pea gravel and drainage pipe in the bunker, sprayed the polyurethane bunker liner on the floor of the bunker and filled the bunker with over half of the sand that was needed.  No sodding today but plan to lay most of the sod around the left bunker tomorrow morning. 

The other 3 bunkers will be trenched tomorrow and spoils removed.  I hope that we can begin to place sand in the two right bunkers tomorrow.  We will be pushing to be fully complete by Thursday but will be close.  With sodding needing to get on the ground, there will be a big push over the next day.



Yours truly with assistance from mechanic Harry spraying the liner material on the bottom of the bunker to reduce soil contamination.



Russ, Jason and Tom spreading sand in the left bunker.

The front right bunker ready for trenching.

The rear bunker prepared for trenching.

The back bunker still needs some edging and dirt work around the bunker and inside.

Day two complete.  Will look a lot different with sod laid tomorrow!