Friday, July 13, 2012

Completion of new spillway drainage at #9

The staff completed the repairs to the underground spillway from #9 lake to the small lake on #10.  120' of double walled 12" pipe was put in place, an irrigation line had to be moved and the area was back filled.  The area is full of bermuda grass so our plan is to fertilize it, water it and watch the bermuda fill in.  I'm sure we will need to do some backfilling of soil when it begins to settle when the rain begins to fall again.


Skip, Harry, Tom and Jason placing the pipe in the trench on Tuesday.  The line was backfilled and graded smooth.

The area after grading.